Evidence Guide: AHCMKH402 - Design and fabricate milking equipment installations

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCMKH402 - Design and fabricate milking equipment installations

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare design and installation estimates

  1. Determine facility design and installation estimates to suit the application
  2. Document financial and physical resources that impact on the proposed works
  3. Identify work health and safety issues that impact on the design and construction of the facility and installation, and incorporate risk controls in the design and construction planning
  4. Determine manpower and other resources required and submit the tender
Determine facility design and installation estimates to suit the application

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document financial and physical resources that impact on the proposed works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify work health and safety issues that impact on the design and construction of the facility and installation, and incorporate risk controls in the design and construction planning

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine manpower and other resources required and submit the tender

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan installation

  1. Complete contract for work including verification of material estimates and costings
  2. Obtain relevant building and planning permits
  3. Ensure site planning includes consideration of environmental issues, service connections and alternative power supplies
  4. Plan required components to match the proposed installation and source from the original equipment manufacturer
  5. Plan the installation to eliminate hazards to people and animals during milking, cleaning or service operations
Complete contract for work including verification of material estimates and costings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain relevant building and planning permits

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure site planning includes consideration of environmental issues, service connections and alternative power supplies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan required components to match the proposed installation and source from the original equipment manufacturer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan the installation to eliminate hazards to people and animals during milking, cleaning or service operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Facilitate the completion of the installation

  1. Carry out job scheduling with all relevant parties
  2. Order and take delivery of physical and material resources
  3. Coordinate the implementation of the milking machine installation
  4. Establish areas of responsibility for all the project participants and provide full notification
Carry out job scheduling with all relevant parties

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Order and take delivery of physical and material resources

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate the implementation of the milking machine installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish areas of responsibility for all the project participants and provide full notification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare design and installation estimates

1.1 Determine facility design and installation estimates to suit the application

1.2 Document financial and physical resources that impact on the proposed works

1.3 Identify work health and safety issues that impact on the design and construction of the facility and installation, and incorporate risk controls in the design and construction planning

1.4 Determine manpower and other resources required and submit the tender

2. Plan installation

2.1 Complete contract for work including verification of material estimates and costings

2.2 Obtain relevant building and planning permits

2.3 Ensure site planning includes consideration of environmental issues, service connections and alternative power supplies

2.4 Plan required components to match the proposed installation and source from the original equipment manufacturer

2.5 Plan the installation to eliminate hazards to people and animals during milking, cleaning or service operations

3. Facilitate the completion of the installation

3.1 Carry out job scheduling with all relevant parties

3.2 Order and take delivery of physical and material resources

3.3 Coordinate the implementation of the milking machine installation

3.4 Establish areas of responsibility for all the project participants and provide full notification

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare design and installation estimates

1.1 Determine facility design and installation estimates to suit the application

1.2 Document financial and physical resources that impact on the proposed works

1.3 Identify work health and safety issues that impact on the design and construction of the facility and installation, and incorporate risk controls in the design and construction planning

1.4 Determine manpower and other resources required and submit the tender

2. Plan installation

2.1 Complete contract for work including verification of material estimates and costings

2.2 Obtain relevant building and planning permits

2.3 Ensure site planning includes consideration of environmental issues, service connections and alternative power supplies

2.4 Plan required components to match the proposed installation and source from the original equipment manufacturer

2.5 Plan the installation to eliminate hazards to people and animals during milking, cleaning or service operations

3. Facilitate the completion of the installation

3.1 Carry out job scheduling with all relevant parties

3.2 Order and take delivery of physical and material resources

3.3 Coordinate the implementation of the milking machine installation

3.4 Establish areas of responsibility for all the project participants and provide full notification

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

prepare design and installation estimates

plan installation

facilitate the completion of the installation

implement work health and safety policies

The candidate must demonstrate knowledge of:

types, functions, cleaning, monitoring and maintenance of milking facilities and milking machine/equipment installations

requirements, resources, components and financial aspects of planning milking equipment installations for milking facilities and enterprises

requirements, resources, components and manpower for implementing installation of milking machine/equipment

relevant enterprise considerations for milking facilities and milking equipment installations

keys aspects and components of tender submissions and contracts for work

types of relevant approvals, authorities and permits required, and procedures to obtain these approvals, authorities and permits

relevant work health and safety requirements