NTISthis.com

Evidence Guide: AHCPER309 - Install and maintain permaculture water systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCPER309 - Install and maintain permaculture water systems

What evidence can you provide to prove your understanding of each of the following citeria?

Organise resources for installation work

  1. Identify the construction site and construction method for the permaculture water system according to the permaculture plan
  2. Select materials, tools, equipment and machinery, water storage, movement and filtering systems according to the permaculture design requirements
  3. Check parts and equipment delivered to the site according to system drawings and specifications on the permaculture plan
  4. Check water supply to ensure that it is compatible with system specifications
  5. Carry out pre-operational and safety checks on tools, equipment and machinery according to manufacturer’s specifications
  6. Select, use and maintain suitable safety and personal protective equipment
Identify the construction site and construction method for the permaculture water system according to the permaculture plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select materials, tools, equipment and machinery, water storage, movement and filtering systems according to the permaculture design requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check parts and equipment delivered to the site according to system drawings and specifications on the permaculture plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check water supply to ensure that it is compatible with system specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out pre-operational and safety checks on tools, equipment and machinery according to manufacturer’s specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, use and maintain suitable safety and personal protective equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and prepare site

  1. Measure and mark out permaculture water system lines or lay out in accordance with the permaculture plan
  2. Dig trenches, where required, at the specified depth without damage to services, facilities, features and established plants
  3. Ensure that equipment operation and work practices conform with OHS requirements
  4. Observe any regulations and legislative requirements relevant to the situation
  5. Consider the needs of other stakeholders while setting out and preparing the site for permaculture water systems
Measure and mark out permaculture water system lines or lay out in accordance with the permaculture plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dig trenches, where required, at the specified depth without damage to services, facilities, features and established plants

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that equipment operation and work practices conform with OHS requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Observe any regulations and legislative requirements relevant to the situation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Consider the needs of other stakeholders while setting out and preparing the site for permaculture water systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install permaculture water systems

  1. Interpret the permaculture plan and, where applicable, supervise and monitor work by contractor
  2. Assemble and connect parts of irrigation systems, where used, according to manufacturer’s specifications and the permaculture plan
  3. Install and adjust pump fittings and valves, where used according to manufacturer’s specifications and the permaculture plan
  4. Maintain a clean and safe work area while installation work is carried out
  5. Check that works can be carried out without a licensed plumber and direct work to licensed individuals where required.
Interpret the permaculture plan and, where applicable, supervise and monitor work by contractor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble and connect parts of irrigation systems, where used, according to manufacturer’s specifications and the permaculture plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and adjust pump fittings and valves, where used according to manufacturer’s specifications and the permaculture plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain a clean and safe work area while installation work is carried out

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that works can be carried out without a licensed plumber and direct work to licensed individuals where required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete installation work

  1. Finish off earthworks to permaculture plan specifications
  2. Check the system configuration and capacity matches the installation plan
  3. Remove or dispose of waste material from the site, and restore site to original state in an environmentally aware and safe manner
  4. Clean, maintain and store tools, equipment and machinery
Finish off earthworks to permaculture plan specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the system configuration and capacity matches the installation plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove or dispose of waste material from the site, and restore site to original state in an environmentally aware and safe manner

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, maintain and store tools, equipment and machinery

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commission permaculture water systems

  1. Prime, start up and flush irrigation and pump systems, where installed, in accordance with the operation manual
  2. Identify and correct any operating faults according to operations manual
  3. Test, calibrate and monitor equipment, where used, according to manufacturer’s specifications
  4. Record or report work outcomes, where appropriate
Prime, start up and flush irrigation and pump systems, where installed, in accordance with the operation manual

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and correct any operating faults according to operations manual

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test, calibrate and monitor equipment, where used, according to manufacturer’s specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record or report work outcomes, where appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and maintain permaculture water systems

  1. Regularly check permaculture water systems and monitor for optimum performance
  2. Carry out routine maintenance procedures on permaculture water systems
  3. Carry out repairs on permaculture water systems as required
  4. Install erosion and sediment control measures, if required, in accordance with manufacturer’s recommendation and the permaculture plan
Regularly check permaculture water systems and monitor for optimum performance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out routine maintenance procedures on permaculture water systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out repairs on permaculture water systems as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install erosion and sediment control measures, if required, in accordance with manufacturer’s recommendation and the permaculture plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Organise resources for installation work

1.1 Identify the construction site and construction method for the permaculture water system according to the permaculture plan

1.2 Select materials, tools, equipment and machinery, water storage, movement and filtering systems according to the permaculture design requirements

1.3 Check parts and equipment delivered to the site according to system drawings and specifications on the permaculture plan

1.4 Check water supply to ensure that it is compatible with system specifications

1.5 Carry out pre-operational and safety checks on tools, equipment and machinery according to manufacturer’s specifications

1.6 Select, use and maintain suitable safety and personal protective equipment

2. Set out and prepare site

2.1 Measure and mark out permaculture water system lines or lay out in accordance with the permaculture plan

2.2 Dig trenches, where required, at the specified depth without damage to services, facilities, features and established plants

2.3 Ensure that equipment operation and work practices conform with OHS requirements

2.4 Observe any regulations and legislative requirements relevant to the situation

2.5 Consider the needs of other stakeholders while setting out and preparing the site for permaculture water systems

3. Install permaculture water systems

3.1 Interpret the permaculture plan and, where applicable, supervise and monitor work by contractor

3.2 Assemble and connect parts of irrigation systems, where used, according to manufacturer’s specifications and the permaculture plan

3.3 Install and adjust pump fittings and valves, where used according to manufacturer’s specifications and the permaculture plan

3.4 Maintain a clean and safe work area while installation work is carried out

3.5 Check that works can be carried out without a licensed plumber and direct work to licensed individuals where required.

4. Complete installation work

4.1 Finish off earthworks to permaculture plan specifications

4.2 Check the system configuration and capacity matches the installation plan

4.3 Remove or dispose of waste material from the site, and restore site to original state in an environmentally aware and safe manner

4.4 Clean, maintain and store tools, equipment and machinery

5. Commission permaculture water systems

5.1 Prime, start up and flush irrigation and pump systems, where installed, in accordance with the operation manual

5.2 Identify and correct any operating faults according to operations manual

5.3 Test, calibrate and monitor equipment, where used, according to manufacturer’s specifications

5.4 Record or report work outcomes, where appropriate

6. Monitor and maintain permaculture water systems

6.1 Regularly check permaculture water systems and monitor for optimum performance

6.2 Carry out routine maintenance procedures on permaculture water systems

6.3 Carry out repairs on permaculture water systems as required

6.4 Install erosion and sediment control measures, if required, in accordance with manufacturer’s recommendation and the permaculture plan

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Organise resources for installation work

1.1 Identify the construction site and construction method for the permaculture water system according to the permaculture plan

1.2 Select materials, tools, equipment and machinery, water storage, movement and filtering systems according to the permaculture design requirements

1.3 Check parts and equipment delivered to the site according to system drawings and specifications on the permaculture plan

1.4 Check water supply to ensure that it is compatible with system specifications

1.5 Carry out pre-operational and safety checks on tools, equipment and machinery according to manufacturer’s specifications

1.6 Select, use and maintain suitable safety and personal protective equipment

2. Set out and prepare site

2.1 Measure and mark out permaculture water system lines or lay out in accordance with the permaculture plan

2.2 Dig trenches, where required, at the specified depth without damage to services, facilities, features and established plants

2.3 Ensure that equipment operation and work practices conform with OHS requirements

2.4 Observe any regulations and legislative requirements relevant to the situation

2.5 Consider the needs of other stakeholders while setting out and preparing the site for permaculture water systems

3. Install permaculture water systems

3.1 Interpret the permaculture plan and, where applicable, supervise and monitor work by contractor

3.2 Assemble and connect parts of irrigation systems, where used, according to manufacturer’s specifications and the permaculture plan

3.3 Install and adjust pump fittings and valves, where used according to manufacturer’s specifications and the permaculture plan

3.4 Maintain a clean and safe work area while installation work is carried out

3.5 Check that works can be carried out without a licensed plumber and direct work to licensed individuals where required.

4. Complete installation work

4.1 Finish off earthworks to permaculture plan specifications

4.2 Check the system configuration and capacity matches the installation plan

4.3 Remove or dispose of waste material from the site, and restore site to original state in an environmentally aware and safe manner

4.4 Clean, maintain and store tools, equipment and machinery

5. Commission permaculture water systems

5.1 Prime, start up and flush irrigation and pump systems, where installed, in accordance with the operation manual

5.2 Identify and correct any operating faults according to operations manual

5.3 Test, calibrate and monitor equipment, where used, according to manufacturer’s specifications

5.4 Record or report work outcomes, where appropriate

6. Monitor and maintain permaculture water systems

6.1 Regularly check permaculture water systems and monitor for optimum performance

6.2 Carry out routine maintenance procedures on permaculture water systems

6.3 Carry out repairs on permaculture water systems as required

6.4 Install erosion and sediment control measures, if required, in accordance with manufacturer’s recommendation and the permaculture plan

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

organise resources for installation work

set out and prepare site

install permaculture water systems materials and components, excluding works requiring a licensed plumber.

commission a permaculture water system

monitor and maintain permaculture water systems

communicate with work team members, supervisors, contractors and consultants

The candidate must demonstrate knowledge of:

permaculture practices regarding water including natural flows, rainwater and wastewater, storage, movement and retention of water in the system

permaculture water systems, such as:

swales

contour banks

terraces

mulch-pit paths

diversion channels and other passive installations

mains pressure systems

low pressure or gravity systems

below-ground systems

above-ground systems

spray, dripper and capillary irrigation systems

water tanks

guttering and first-flush diversion system

water supply components, such as:

mains

dam

bore

windmill

tank

channel

understanding of contours

installation methods and techniques for permaculture water systems

components of permaculture water systems

characteristics and operation of joints, valves and sprinkler components

operation of pumps and water flow rates

behaviour of water on varying terrain and soil types

soil water retention testing techniques

water quality and water filtration techniques

calculations for installing permaculture water systems

soil characteristics

regulations and legislative requirements, such as:

permits for pruning or removal of large trees

connecting to water systems

licences for operating specialised machinery, such as chainsaws, skid steer loaders and forklifts

setting up traffic and pedestrian barriers

digging near services (phone, gas, power, water, sewerage and drains)

installing dams or diverting water in catchments

installing tanks

planning acts and codes

earth movement and digging guidelines and legislation

environmental legislation

land restoration codes

water conservation guidelines and legislation

soil movement regulations

habitat and wildlife protection legislation

Range Statement