The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Research building methods
|
|
Research appropriate building methods to decide which methods will be appropriate for the project Completed |
Evidence:
|
Review the availability of materials locally and their suitability for the chosen method Completed |
Evidence:
|
Consult experts and tradespeople to confirm suitability of chosen building method and materials Completed |
Evidence:
|
Prepare for the building project
|
|
Collect materials on site Completed |
Evidence:
|
Obtain labour support and engage experts where necessary Completed |
Evidence:
|
Clear the site and mark out the area Completed |
Evidence:
|
Build with earth, straw and reclaimed materials
|
|
Using the chosen method, commence building the structure Completed |
Evidence:
|
Use reclaimed materials where possible and ensure that they are structurally suitable Completed |
Evidence:
|
Use natural finishes and treatments where possible and appropriate Completed |
Evidence:
|
Limit and re-use surplus and waste materials
|
|
Ensure that the surplus or waste materials are stockpiled or stored for future re-use where possible Completed |
Evidence:
|
Demonstrate appropriate uses for all available materials and share and swap with other projects where possible Completed |
Evidence:
|
Limit the amount of waste material removed from the site and ensure that it goes to a new use rather than to landfill wherever possible Completed |
Evidence:
|
Check quality of work and clean-up site
|
|
Inspect quality of finished works and ensure the standard of the finished built structure is appropriate to the permaculture design drawings and specifications Completed |
Evidence:
|
Clean up debris from structure and site Completed |
Evidence:
|
Clean and store tools and equipment Completed |
Evidence:
|