Evidence Guide: AHCPER505 - Plan and supervise the implementation of permaculture project works

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCPER505 - Plan and supervise the implementation of permaculture project works

What evidence can you provide to prove your understanding of each of the following citeria?

Carry out preliminary activities for permaculture project works

  1. Confirm and verify client preferences and contract requirements for permaculture project
  2. Determine scope of works
  3. Identify specific statutory obligations
  4. Conduct initial site visit to verify the biophysical and other factors of the project area, including environmental considerations and historical modifications
  5. Analyse technical challenges and forecast required research and planning
  6. Review scope of works and contract requirements with respect to permaculture principles and ethics
  7. Identify work health and safety hazards and obligations
Confirm and verify client preferences and contract requirements for permaculture project

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine scope of works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify specific statutory obligations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct initial site visit to verify the biophysical and other factors of the project area, including environmental considerations and historical modifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse technical challenges and forecast required research and planning

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review scope of works and contract requirements with respect to permaculture principles and ethics

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify work health and safety hazards and obligations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Investigate resource issues associated with the works

  1. Verify the availability, quantity and costs of plants and other materials listed in the project schedules
  2. Identify and cost material resources and tools and equipment required for permaculture works
  3. Confirm availability with suppliers, contractors and appropriate personnel
  4. Investigate site access and establishment issues and plan for environmental impacts
Verify the availability, quantity and costs of plants and other materials listed in the project schedules

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and cost material resources and tools and equipment required for permaculture works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm availability with suppliers, contractors and appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Investigate site access and establishment issues and plan for environmental impacts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare a permaculture project works plan

  1. Document a statement of scope of works
  2. Prepare a safety plan for permaculture project works
  3. List tools and materials required for permaculture project works their amounts and their sources
  4. Prepare a staged program of works to provide a sequential allocation of material resources and works tasks with specifications to meet determined project timelines
  5. Evaluate program of works with respect to accepted permaculture practices
  6. Determine the establishment period and maintenance period of works
  7. Incorporate seasonal factors and impacts in the staging strategy
  8. Include, where required, special project works related to habitat resource development and enhancement in the staged implementation plan
  9. Develop and prepare a consistently formatted permaculture works plan document
Document a statement of scope of works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare a safety plan for permaculture project works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

List tools and materials required for permaculture project works their amounts and their sources

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare a staged program of works to provide a sequential allocation of material resources and works tasks with specifications to meet determined project timelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate program of works with respect to accepted permaculture practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine the establishment period and maintenance period of works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Incorporate seasonal factors and impacts in the staging strategy

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Include, where required, special project works related to habitat resource development and enhancement in the staged implementation plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop and prepare a consistently formatted permaculture works plan document

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement permaculture project works plan

  1. Supervise permaculture project works
  2. Take delivery of materials and equipment
  3. Assemble human resources on site
  4. Undertake works briefing and safety briefing
  5. Undertake and manage permaculture project works
  6. Inspect works tasks for adherence to specifications, correcting and modifying as necessary
  7. Monitor environmental impacts of project works and modify where required
  8. Complete permaculture project works and confirm satisfactory outcome with client
Supervise permaculture project works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take delivery of materials and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble human resources on site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake works briefing and safety briefing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake and manage permaculture project works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect works tasks for adherence to specifications, correcting and modifying as necessary

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor environmental impacts of project works and modify where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete permaculture project works and confirm satisfactory outcome with client

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Carry out preliminary activities for permaculture project works

1.1 Confirm and verify client preferences and contract requirements for permaculture project

1.2 Determine scope of works

1.3 Identify specific statutory obligations

1.4 Conduct initial site visit to verify the biophysical and other factors of the project area, including environmental considerations and historical modifications

1.5 Analyse technical challenges and forecast required research and planning

1.6 Review scope of works and contract requirements with respect to permaculture principles and ethics

1.7 Identify work health and safety hazards and obligations

2. Investigate resource issues associated with the works

2.1 Verify the availability, quantity and costs of plants and other materials listed in the project schedules

2.2 Identify and cost material resources and tools and equipment required for permaculture works

2.3 Confirm availability with suppliers, contractors and appropriate personnel

2.4 Investigate site access and establishment issues and plan for environmental impacts

3. Prepare a permaculture project works plan

3.1 Document a statement of scope of works

3.2 Prepare a safety plan for permaculture project works

3.3 List tools and materials required for permaculture project works their amounts and their sources

3.4 Prepare a staged program of works to provide a sequential allocation of material resources and works tasks with specifications to meet determined project timelines

3.5 Evaluate program of works with respect to accepted permaculture practices

3.6 Determine the establishment period and maintenance period of works

3.7 Incorporate seasonal factors and impacts in the staging strategy

3.8 Include, where required, special project works related to habitat resource development and enhancement in the staged implementation plan

3.9 Develop and prepare a consistently formatted permaculture works plan document

4. Implement permaculture project works plan

4.1 Supervise permaculture project works

4.2 Take delivery of materials and equipment

4.3 Assemble human resources on site

4.4 Undertake works briefing and safety briefing

4.5 Undertake and manage permaculture project works

4.6 Inspect works tasks for adherence to specifications, correcting and modifying as necessary

4.7 Monitor environmental impacts of project works and modify where required

4.8 Complete permaculture project works and confirm satisfactory outcome with client

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Carry out preliminary activities for permaculture project works

1.1 Confirm and verify client preferences and contract requirements for permaculture project

1.2 Determine scope of works

1.3 Identify specific statutory obligations

1.4 Conduct initial site visit to verify the biophysical and other factors of the project area, including environmental considerations and historical modifications

1.5 Analyse technical challenges and forecast required research and planning

1.6 Review scope of works and contract requirements with respect to permaculture principles and ethics

1.7 Identify work health and safety hazards and obligations

2. Investigate resource issues associated with the works

2.1 Verify the availability, quantity and costs of plants and other materials listed in the project schedules

2.2 Identify and cost material resources and tools and equipment required for permaculture works

2.3 Confirm availability with suppliers, contractors and appropriate personnel

2.4 Investigate site access and establishment issues and plan for environmental impacts

3. Prepare a permaculture project works plan

3.1 Document a statement of scope of works

3.2 Prepare a safety plan for permaculture project works

3.3 List tools and materials required for permaculture project works their amounts and their sources

3.4 Prepare a staged program of works to provide a sequential allocation of material resources and works tasks with specifications to meet determined project timelines

3.5 Evaluate program of works with respect to accepted permaculture practices

3.6 Determine the establishment period and maintenance period of works

3.7 Incorporate seasonal factors and impacts in the staging strategy

3.8 Include, where required, special project works related to habitat resource development and enhancement in the staged implementation plan

3.9 Develop and prepare a consistently formatted permaculture works plan document

4. Implement permaculture project works plan

4.1 Supervise permaculture project works

4.2 Take delivery of materials and equipment

4.3 Assemble human resources on site

4.4 Undertake works briefing and safety briefing

4.5 Undertake and manage permaculture project works

4.6 Inspect works tasks for adherence to specifications, correcting and modifying as necessary

4.7 Monitor environmental impacts of project works and modify where required

4.8 Complete permaculture project works and confirm satisfactory outcome with client

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

determine and review project scope of work

assess a site for opportunities and constraints associated with implementation of permaculture works

prepare schedules for implementation of permaculture works

prepare a staged permaculture works plan

complete a work health and safety briefing

prepare a Statement of Environmental Effects

supervise permaculture project works

The candidate must demonstrate knowledge of:

permaculture principles and practices

Permaculture project works, such as:

food gardens

community gardens

urban permaculture systems

rural permaculture systems

aquaculture systems

horticultural systems

forest systems

grazing and pasture systems

animal systems and tractors

integrated food, fibre and energy systems

permaculture structures

soil treatments

preparation of soil surfaces

installation of irrigation and/or drainage systems including earthworks

planting methods such as hand sowing, direct seeding, tube planting, hand or machine assisted planting of seedlings, planting of divisions and transplanting

natural area regeneration

fencing of stock and pest animals

the cultural or biological control of weeds and feral animals

protection of plants by staking, tying and guarding

permaculture design techniques including zone and sector planning

biophysical factors of a site, such as:

location of the site

site boundaries

environmental considerations

access issues

potential hazards

utility service

availability and locations

adjacent landholder considerations

security issues

aspect of the site

rainfall

humidity

wind and sunlight intensity

soil types

nutrients and deficiencies

slope

natural and artificial watercourses

outcrops of rock

presence of indigenous or other significant vegetation, indigenous or otherwise

plants that may become a weed problem

animals that may become a management issue, feral species or otherwise

practical understanding of the environmental issues associated with undertaking permaculture works, such as:

use of materials that come from sustainable sources

duty of care in conserving sites natural values

work practices

the use and movement of machinery, storage of materials, removal of weeds and movement of soil and other materials into, across and beyond the site

principles of ecology including specific plant and animal relationships and habitat requirements

statutory compliance and obligations, such as

compliance with legislation, ordinances, regulations or by laws relating to the works or the work site

site responsibilities, including OHS, industrial relations and equal opportunity and employment

site evaluation techniques including methods of analysing soils, waterways and their condition

control techniques against unwanted plant and animal species

soil conservation, erosion control and enhancement techniques and their advantages and disadvantages in reference to specific sites and habitats

selection and use of appropriate combinations of machinery and tools

work health and safety hazards and the controls necessary to remove or minimise risks associated with them

contract documentation including specifications, plans of permaculture works, services, supplies and surveyors documents

scope of works determination

works breakdown into tasks

scheduling and time line generation

task specifications and evaluation

Range Statement