NTISthis.com

Evidence Guide: AHCTRF402A - Plan and implement sports turf renovation

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCTRF402A - Plan and implement sports turf renovation

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare the turf renovation program

  1. The turf renovation site is identified and field measurements and tests undertaken.
  2. Site hazards are identified, risks assessed and controls implemented.
  3. Renovation materials and resource requirements are selected and calculated.
  4. Renovation costs are checked to be within budget levels and are verified by client/manager.
  5. Existing design plans and documentation are interpreted or new design plans are developed.
  6. A renovation program is developed containing the site assessment report, results of field measurements and tests, risk controls, and material and resource calculations.
  7. Schedule of works and specifications are developed and recorded in the program.
The turf renovation site is identified and field measurements and tests undertaken.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site hazards are identified, risks assessed and controls implemented.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Renovation materials and resource requirements are selected and calculated.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Renovation costs are checked to be within budget levels and are verified by client/manager.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Existing design plans and documentation are interpreted or new design plans are developed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

A renovation program is developed containing the site assessment report, results of field measurements and tests, risk controls, and material and resource calculations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Schedule of works and specifications are developed and recorded in the program.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare renovation equipment

  1. Machinery maintenance logs, maintenance plans and schedules are checked and machinery prepared for the program.
  2. Pre-operational and safety checks are carried out on tools, equipment and machinery according to manufacturer specifications and enterprise work procedures.
  3. Tools, equipment and machinery are calibrated and adjusted according to manufacturer guidelines and documented work method statements.
  4. Records of checks, calibrations and adjustments are entered into workplace documentation.
Machinery maintenance logs, maintenance plans and schedules are checked and machinery prepared for the program.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pre-operational and safety checks are carried out on tools, equipment and machinery according to manufacturer specifications and enterprise work procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and machinery are calibrated and adjusted according to manufacturer guidelines and documented work method statements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Records of checks, calibrations and adjustments are entered into workplace documentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement the renovation program

  1. Enterprise work team and contractors are identified and work tasks are coordinated in a sequential, timely and effective manner in consultation with the client, superintendent or board.
  2. Work pattern is organised and directed according to the schedule of works.
  3. Works are supervised and executed according to Occupational Health and Safety (OHS) requirements and environmental implications.
  4. Renovation tasks are monitored and remedial action is undertaken where necessary.
  5. A clean and safe work area is maintained throughout and on completion of work.
Enterprise work team and contractors are identified and work tasks are coordinated in a sequential, timely and effective manner in consultation with the client, superintendent or board.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work pattern is organised and directed according to the schedule of works.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Works are supervised and executed according to Occupational Health and Safety (OHS) requirements and environmental implications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Renovation tasks are monitored and remedial action is undertaken where necessary.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

A clean and safe work area is maintained throughout and on completion of work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete renovation activities

  1. Site and surrounds are reviewed for completion of works and disposal of waste material.
  2. Tools, equipment and machinery are inspected and repair and maintenance requirements logged.
  3. Expenses are recorded and reviewed against budget.
  4. The renovation program is reviewed for costs, scheduling, works procedures and quality of work.
  5. A works report is documented and presented to the client/manager or board.
Site and surrounds are reviewed for completion of works and disposal of waste material.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and machinery are inspected and repair and maintenance requirements logged.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Expenses are recorded and reviewed against budget.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The renovation program is reviewed for costs, scheduling, works procedures and quality of work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

A works report is documented and presented to the client/manager or board.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

plan a sports turf renovation program

conduct a site hazard identification and risk control assessment

develop a schedule of works and specifications for a sports turf renovation program

implement the schedule of works for sports turf surfaces

coordinate the work team and contractors

document a sports turf renovation program.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.

Required Skills and Knowledge

Required skills

interpret existing plans or develop new plans

conduct a site hazard identification and risk control assessment

apply renovation program specifications

coordinate work group, contractors and own activities

sequentially and effectively complete turf renovation in a timely and cost-effective manner

develop and document a program of works

use literacy skills to read, interpret and follow organisational policies and procedures, develop sequenced written instructions, record information collected accurately and legibly, and select and apply procedures to a range of tasks

use oral communication skills/language competence to fulfil the job role as specified by the organisation, including questioning, active listening, asking for clarification, negotiating solutions and responding to a range of views

use numeracy skills to estimate, calculate and record routine and more complex workplace measures and data

use interpersonal skills to work with others and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge

specialist turf renovation practices to achieve high performance turf

field measurements, such as infiltration rate, organic fines, hardness, traction, surface smoothness and turf sward height

enterprise and industry standards for turf surface appearance and quality

comparative environmental implications of renovation activities, turf and soil treatments, and waste disposal procedures

planting, care and renovation scheduling requirements of grass species and cultivars.

Range Statement

The range statement relates to the unit of competency as a whole.

Turf materials include:

materials covering cool or warm season turf seed or plants of the species and cultivar specified by the supervisor and/or the turf renovation program.