NTISthis.com

Evidence Guide: AURRTE001 - Carry out wet run tests on vessel outboard engines

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AURRTE001 - Carry out wet run tests on vessel outboard engines

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to wet run an outboard engine

  1. Job requirements are determined from workplace instructions
  2. Test procedures and information are accessed and interpreted and appropriate test method is selected
  3. Hazards associated with the work are identified and risks are managed
  4. Tools and test equipment are selected and checked and wet run test area is prepared according to workplace procedures
Job requirements are determined from workplace instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test procedures and information are accessed and interpreted and appropriate test method is selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards associated with the work are identified and risks are managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and test equipment are selected and checked and wet run test area is prepared according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up engine and equipment for wet run test

  1. Engine is checked for ability to run through testing operating range according to manufacturer specifications and workplace procedures
  2. Engine is prepared and wet run equipment mounted according to manufacturer specifications and workplace procedures
  3. Required testing equipment is attached to engine according to manufacturer specifications and workplace procedures
Engine is checked for ability to run through testing operating range according to manufacturer specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Engine is prepared and wet run equipment mounted according to manufacturer specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Required testing equipment is attached to engine according to manufacturer specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out wet run test

  1. Engine is started and operated throughout test operating range according to manufacturer specifications, workplace procedures, and safety and environmental requirements
  2. Engine test results are monitored during wet run test according to manufacturer specifications and workplace procedures
  3. Wet run test results are recorded according to workplace procedures
Engine is started and operated throughout test operating range according to manufacturer specifications, workplace procedures, and safety and environmental requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Engine test results are monitored during wet run test according to manufacturer specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Wet run test results are recorded according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work processes

  1. Final inspection is made to ensure work is to workplace expectations and engine is presented ready for use
  2. Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
  3. Tools and equipment are checked and stored according to workplace procedures
  4. Workplace documentation is processed according to workplace procedures
Final inspection is made to ensure work is to workplace expectations and engine is presented ready for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are checked and stored according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is processed according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare to wet run an outboard engine

  1. Job requirements are determined from workplace instructions
  2. Test procedures and information are accessed and interpreted and appropriate test method is selected
  3. Hazards associated with the work are identified and risks are managed
  4. Tools and test equipment are selected and checked and wet run test area is prepared according to workplace procedures
Job requirements are determined from workplace instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test procedures and information are accessed and interpreted and appropriate test method is selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards associated with the work are identified and risks are managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and test equipment are selected and checked and wet run test area is prepared according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up engine and equipment for wet run test

  1. Engine is checked for ability to run through testing operating range according to manufacturer specifications and workplace procedures
  2. Engine is prepared and wet run equipment mounted according to manufacturer specifications and workplace procedures
  3. Required testing equipment is attached to engine according to manufacturer specifications and workplace procedures
Engine is checked for ability to run through testing operating range according to manufacturer specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Engine is prepared and wet run equipment mounted according to manufacturer specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Required testing equipment is attached to engine according to manufacturer specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out wet run test

  1. Engine is started and operated throughout test operating range according to manufacturer specifications, workplace procedures, and safety and environmental requirements
  2. Engine test results are monitored during wet run test according to manufacturer specifications and workplace procedures
  3. Wet run test results are recorded according to workplace procedures
Engine is started and operated throughout test operating range according to manufacturer specifications, workplace procedures, and safety and environmental requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Engine test results are monitored during wet run test according to manufacturer specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Wet run test results are recorded according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work processes

  1. Final inspection is made to ensure work is to workplace expectations and engine is presented ready for use
  2. Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
  3. Tools and equipment are checked and stored according to workplace procedures
  4. Workplace documentation is processed according to workplace procedures
Final inspection is made to ensure work is to workplace expectations and engine is presented ready for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are checked and stored according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is processed according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare to wet run an outboard engine

1.1 Job requirements are determined from workplace instructions

1.2 Test procedures and information are accessed and interpreted and appropriate test method is selected

1.3 Hazards associated with the work are identified and risks are managed

1.4 Tools and test equipment are selected and checked and wet run test area is prepared according to workplace procedures

2. Set up engine and equipment for wet run test

2.1 Engine is checked for ability to run through testing operating range according to manufacturer specifications and workplace procedures

2.2 Engine is prepared and wet run equipment mounted according to manufacturer specifications and workplace procedures

2.3 Required testing equipment is attached to engine according to manufacturer specifications and workplace procedures

3. Carry out wet run test

3.1 Engine is started and operated throughout test operating range according to manufacturer specifications, workplace procedures, and safety and environmental requirements

3.2 Engine test results are monitored during wet run test according to manufacturer specifications and workplace procedures

3.3 Wet run test results are recorded according to workplace procedures

4. Complete work processes

4.1 Final inspection is made to ensure work is to workplace expectations and engine is presented ready for use

4.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

4.3 Tools and equipment are checked and stored according to workplace procedures

4.4 Workplace documentation is processed according to workplace procedures

Required Skills and Knowledge

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare to wet run an outboard engine

1.1 Job requirements are determined from workplace instructions

1.2 Test procedures and information are accessed and interpreted and appropriate test method is selected

1.3 Hazards associated with the work are identified and risks are managed

1.4 Tools and test equipment are selected and checked and wet run test area is prepared according to workplace procedures

2. Set up engine and equipment for wet run test

2.1 Engine is checked for ability to run through testing operating range according to manufacturer specifications and workplace procedures

2.2 Engine is prepared and wet run equipment mounted according to manufacturer specifications and workplace procedures

2.3 Required testing equipment is attached to engine according to manufacturer specifications and workplace procedures

3. Carry out wet run test

3.1 Engine is started and operated throughout test operating range according to manufacturer specifications, workplace procedures, and safety and environmental requirements

3.2 Engine test results are monitored during wet run test according to manufacturer specifications and workplace procedures

3.3 Wet run test results are recorded according to workplace procedures

4. Complete work processes

4.1 Final inspection is made to ensure work is to workplace expectations and engine is presented ready for use

4.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

4.3 Tools and equipment are checked and stored according to workplace procedures

4.4 Workplace documentation is processed according to workplace procedures

Before competency can be determined, individuals must demonstrate they can perform the following according to the standards defined in this unit’s elements, performance criteria, range of conditions and foundation skills:

carry out wet run testing on two outboard engines, including one outboard engine fitted to a boat.

Individuals must be able to demonstrate knowledge of:

work health and safety (WHS) and occupational health and safety (OHS) requirements relating to wet run testing vessel outboard engines, including procedures for:

lifting and supporting outboard engines

working with outboard engines, including:

rotating components

propellers

exhaust emissions

abnormal noise

environmental requirements, including procedures for trapping, storing and disposing of fluids released from engines during wet run testing

types and classifications of outboard engines, including two- and four-stroke engines

wet running procedures for outboard engines, including:

using test tanks

using outboard engine flushers

checking throttle, choke and fast idle settings

testing procedures for wet running outboard engines, including attaching tachometers to engines.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Safety and environmental requirements must include:

work health and safety (WHS) and occupational health and safety (OHS) requirements, including procedures for:

lifting and supporting outboard engines

working with outboard engines, including:

rotating components

propellers

exhaust emissions

environmental requirements, including procedures for trapping, storing and disposing of fluids released from engines during wet run testing.

Wet run test results must include:

attaching flushing device

checking security of fittings

connecting remote water supply

regulating water supply for test.