NTISthis.com

Evidence Guide: AVIY0026 - Conduct aerial application operations using remote pilot aircraft systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AVIY0026 - Conduct aerial application operations using remote pilot aircraft systems

What evidence can you provide to prove your understanding of each of the following citeria?

Conduct pre-flight actions

  1. Own fitness for flight and planned operations is self-assessed
Own fitness for flight and planned operations is self-assessed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operational aircraft type is determined for suitability for type of aerial application operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Aircraft and role equipment are checked and assessed for serviceability prior to commencing flight operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Required applicable maintenance documentation is compiled and checked for accuracy and completeness

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Role equipment calibration is checked and adjusted as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Planned aerial application operations are assessed for potential or actual hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fuel/power requirements are determined and established within aerial application management plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Logistical considerations are addressed within scope of application management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct planning and risk management

  1. Suitability of current and forecast weather is determined
Suitability of current and forecast weather is determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Application management plan is developed and used as the basis for aerial application operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Potential and actual hazards and operational requirements are identified, risks to aerial application operations are assessed and appropriate risk controls are implemented in accordance with the application management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Treatment area map is correctly interpreted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pilot decision on the safety of the proposed application, including refusing to undertake an application where the risks are considered to be too high, is made as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate selection of application pattern and direction of treatment is made taking into consideration safety, efficiency, hazards and terrain

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Acceptable aircraft performance for aerial application operational conditions is confirmed through performance planning

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Normal and abnormal operational communications and signals are confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform operational area evaluation

  1. Operational landing areas are assessed for condition, approach/landing direction, hazard identification and meteorological conditions
Operational landing areas are assessed for condition, approach/landing direction, hazard identification and meteorological conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Issues relating to aircraft weight, performance, dimensions, load and meteorological conditions are identified and managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Landing areas suitable for conducting aerial application operations are selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Aircraft pre-landing/launch checks are performed in accordance with operational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate landing and launch techniques are conducted during aerial application operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Aerial application operations are performed in accordance with published regulations requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate aerial survey plans are developed for conducting safe aerial application operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operating area boundaries are established and environmentally sensitive areas are identified, including areas that are noise sensitive, biologically susceptible, populated and urban, and restricted or dangerous

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Potential emergency or alternate landing areas are identified and/or established for contingency operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental hazard factors affecting aerial application operations are considered

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Wind velocity and direction are assessed for effect on operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Application management plans are amended or modified based on aerial survey assessment results as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

GNSS familiarity is applied to the appropriate level of operational requirement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sound judgement is applied during application treatment area pattern selection

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Aircraft is operated at maximum permissible weights for aerial application operations in accordance with manufacturer and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Aircraft launch weight is determined within requirements relevant to operating conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate within the vicinity of power lines

  1. Power lines within and outside the treatment area during an aerial survey are identified
Power lines within and outside the treatment area during an aerial survey are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Power line infrastructure cues are interpreted to aid wire run identification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Wire heights are accurately assessed to support safe operations in vicinity of power lines, including safe flying parallel to wires

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Other hazards relevant to operations near power lines, such as pole stays, crop height, fences or machinery that may pose a risk, are identified and managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safe command decision whether to fly over or under a wire is made

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Aerial application operations over wires, including adequate safety buffers for pull-up and let down and accurate cut-off and on-off application equipment, are conducted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Aerial application operations under wires, including assessment of safe clearance distances, are conducted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Application approaches towards power lines when passage beneath is unachievable are terminated safely

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Human factors that may affect operations near power lines, particularly distraction, short-term memory limitations and inattention (perceptual) blindness are applied during aerial application operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply substances through aerial application

  1. Substances are applied safely in accordance with the application management plan
Substances are applied safely in accordance with the application management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correct application height relevant to terrain, application type and meteorological conditions is established and maintained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate airspeed and flight profile are controlled on entry or re-entry to operational areas

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Aerial application equipment is operated within scope of the application management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazard areas are manoeuvred around with adequate safety margins during application operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Application flow rates, pressure and product quantities are monitored during application operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Decisions to suspend or continue safe aerial application operations are made based on planned or actual operating conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean-up operations and hazard safety checks are conducted on completion of aerial application

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.