NTISthis.com

Evidence Guide: AVIY0071 - Pilot a helicopter during hoisting operations

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AVIY0071 - Pilot a helicopter during hoisting operations

What evidence can you provide to prove your understanding of each of the following citeria?

Plan hoisting operations

  1. Tasking requirements are identified
Tasking requirements are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Crew and equipment required to ensure safe achievement of task are determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Helicopter performance data is interpreted and calculated to ensure suitability of aircraft for operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Transit, hoisting operation communications and recovery are planned in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operations at hoist site, including consideration of obstructions, terrain and any factors that may adversely affect lift, are planned

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Abnormal and emergency hoisting situation contingency procedures are planned

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct pre-flight briefings

  1. Hoisting operational requirements are briefed and confirmed with relevant personnel
Hoisting operational requirements are briefed and confirmed with relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Location, terrain features (sea state as required) and forecast weather conditions are obtained and confirmed with relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timings, route/s, airspeeds and altitudes are confirmed with relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant personnel are briefed about pilot, crew and hoisting personnel responsibilities and communication procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Abnormal and emergency hoisting situation contingency procedures are briefed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate a helicopter during hoisting operations

  1. Adequacy of hover power margin and control limits to perform hoisting operations is checked and maintained
Adequacy of hover power margin and control limits to perform hoisting operations is checked and maintained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site inspection, approach and hover heading are determined in accordance with operational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Descent and approach are controlled to terminate over hoist site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Control is applied to helicopter to maintain position over hoist site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obstacle clearances to obstructions, constructions and terrain are maintained during deployment and retrieval operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Effective communications with crew and relevant personnel are maintained during operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety and security of passengers and/or cargo is managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hoist cable is recovered and stowed, and site is vacated in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manage abnormal and emergency situations

  1. Helicopter control is maintained
Helicopter control is maintained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Abnormal and/or emergency situations are identified and managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hoist cargo/personnel are safely jettisoned (as required) when flight safety or hover stability is compromised

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct post-flight briefings

  1. Operating procedures and flight outcomes are reviewed and analysed
Operating procedures and flight outcomes are reviewed and analysed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Effectiveness, efficiency and performance of equipment are analysed and reported

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspection, servicing and stowage of hoist equipment are organised/confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.