The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Start engine
|
|
Pre-start and after-start checks are completed in accordance with aircraft flight manual (AFM)/pilot’s operating handbook (POH) Completed |
Evidence:
|
RPAS is positioned to ensure safety when starting engine Completed |
Evidence:
|
Manufacturer limitations and report deviations are complied with as required Completed |
Evidence:
|
Engine/s are started in accordance with AFM/POH Completed |
Evidence:
|
Emergencies are managed in accordance with AFM/POH and regulatory requirements Completed |
Evidence:
|
Taxi and/or position RPA
|
|
Automatic terminal information service (ATIS) reports and taxi clearance are obtained as required Completed |
Evidence:
|
RPAS is taxied at a safe speed and in accordance with prevailing location, traffic, surface and weather conditions Completed |
Evidence:
|
Instrument checks are performed clear of conflicting traffic and other hazards to confirm serviceability Completed |
Evidence:
|
Handling and braking on ground is in accordance with AFM/POH Completed |
Evidence:
|
Airfield markings/lights/signals/indicators are interpreted and complied with as required Completed |
Evidence:
|
Lookout and right-of-way rules are complied with as required Completed |
Evidence:
|
Adverse effects on other aircraft, facilities and personnel is avoided Completed |
Evidence:
|
Inspection of taxi path is carried out when surface conditions are obscured as required Completed |
Evidence:
|
RPAS (and launch system) is positioned in accordance with launch point requirements and applicable safety precautions Completed |
Evidence:
|
Perform RPA shutdown
|
|
Pre-and post shutdown checks are completed in accordance with AFM/POH Completed |
Evidence:
|
Engine is shut down in accordance with AFM/POH Completed |
Evidence:
|
Required documentation is completed in accordance with workplace procedures Completed |
Evidence:
|