The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for work.
|
|
Work instructions, including plans, specifications, quality requirements and operational details for context of fire-rated systems are obtained, confirmed and applied. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Environmental protection requirements for the project are identified and applied in accordance with environmental plans and regulatory obligations. Completed |
Evidence:
|
Identify authorised installation materials and techniques.
|
|
Authorised materials and installation techniques for walls, partitions, ceilings, openings and penetrations are identified and confirmed from the plan, relevant standards and codes and manufacturer specifications. Completed |
Evidence:
|
Authorised materials and installation techniques for air handling, structural encasement and fire escape systems are identified and confirmed from the plan, relevant standards and codes and manufacturer specifications. Completed |
Evidence:
|
Most suitable system is selected to meet job specifications. Completed |
Evidence:
|
Inspect for compliance with authorised standards.
|
|
Installation is progressively inspected to confirm that materials and work comply with the authorised plan and standards and rigidly follow the test and/or sponsored investigation documents. Completed |
Evidence:
|
Fire rating, including resistance levels and resistance to incipient spread of fire, is confirmed. Completed |
Evidence:
|
At each stage of installation, walls, ceilings, openings, penetrations and other special needs are inspected and confirmed as being compliant. Completed |
Evidence:
|
Steel componentry and fastener loadings are inspected and confirmed as being compliant. Completed |
Evidence:
|
Record and report the results of inspections.
|
|
Results of inspections, including certification, are completed in accordance with authorised procedures. Completed |
Evidence:
|
Inspection findings, including non-conformance sheets, are completed and reported to appropriate authority. Completed |
Evidence:
|
Feedback and advice are provided at the work site in accordance with authorised procedures and industry practice. Completed |
Evidence:
|