The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information to determine laying of glass blockwork. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. Completed |
Evidence:
|
Prepare for installation.
|
|
Location and dimensions of glass blockwork are determined from plans and specifications. Completed |
Evidence:
|
Work platform is erected in accordance with regulatory authorities' and workplace requirements. Completed |
Evidence:
|
Area for set out is located and base and abutting surfaces are checked for level and plumb, and are finished to specifications. Completed |
Evidence:
|
Surface area preparation for blockwork installation is checked to be clean, dry and in accordance with manufacturer recommendations, plans and specifications. Completed |
Evidence:
|
Wall or section of blockwork is set out to base details according to plans and specifications. Completed |
Evidence:
|
Mortar mix is prepared and checked for conformity to specifications and standards. Completed |
Evidence:
|
Install glass blocks.
|
|
If required by specifications, frame is installed onto the base and fixed into position in accordance with manufacturer requirements. Completed |
Evidence:
|
Mortar mix is applied according to manufacturer recommendations, standards, plans and specifications. Completed |
Evidence:
|
Glass blocks are laid to set out line, plumb, level and to design pattern in accordance with manufacturer recommendations, plans and specifications. Completed |
Evidence:
|
Glass blockwork installation is completed to standards, plans and specifications. Completed |
Evidence:
|
Glass blockwork joints are tool finished to achieve specified finish in accordance with manufacturer recommendations, standards, plans and specifications. Completed |
Evidence:
|
Excess mortar mix is removed from glass blockwork and surfaces are cleaned in accordance with manufacturer recommendations, standards, plans and specifications. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|