The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information to determine the required bricklaying and blocklaying tasks. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. Completed |
Evidence:
|
Prepare for construction.
|
|
FRL is established, and type of fire-resistant construction and material requirements are determined from job plans and design specifications. Completed |
Evidence:
|
Location and composition of wall structure are identified from job plans and specifications. Completed |
Evidence:
|
Mortar mix is prepared and checked for conformity to specifications and standards. Completed |
Evidence:
|
Work platform is erected in accordance with regulatory authorities' requirements. Completed |
Evidence:
|
Construct masonry wall systems.
|
|
Fire-resistant wall types are identified as satisfying FRL for integrity and insulation. Completed |
Evidence:
|
Masonry wall is constructed using specified bricks/blocks laid to specification to satisfy FRL for design specifications, codes and structural adequacy in accordance with standards. Completed |
Evidence:
|
Finish joints and junctions.
|
|
Fire seal is installed in accordance with manufacturer specifications to form a continuous fire block between separating wall structure and roof covering. Completed |
Evidence:
|
Service penetrations are installed to specifications to maintain integrity of design. Completed |
Evidence:
|
Excess mortar is removed from brick/blockwork surfaces and cavities are cleaned free of mortar and debris in accordance with job specifications and standards. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|