The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details are obtained for planning the work and confirmed and applied from relevant information. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity and quality requirements are calculated in accordance with plans and specifications. Completed |
Evidence:
|
Materials appropriate to construction of ceiling frames, including fire resistance ratings are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. Completed |
Evidence:
|
Passive and active fire control elements for ceiling frame construction and installation are identified and applied. Completed |
Evidence:
|
Locate ceiling joists.
|
|
Ceiling frame components are identified and selected in accordance with regulatory criteria. Completed |
Evidence:
|
Location of ceiling joists are set out on the top plate to specifications for spacings of roof and ceiling members. Completed |
Evidence:
|
Ceiling joists and trimmers are cut to length, placed and securely fixed to locations in accordance with specifications. Completed |
Evidence:
|
Install hanging beams.
|
|
Hanging beam sizes and spacings are checked in accordance with regulatory criteria. Completed |
Evidence:
|
Hanging beams are installed. Completed |
Evidence:
|
Hanging beams on external walls are placed alongside rafter locations where specified. Completed |
Evidence:
|
Ceiling joists are connected using appropriate connecting methods to hanging beams. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|