The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. Completed |
Evidence:
|
Set out formwork.
|
|
Set out points and lines are located according to engineer's drawings, survey datum points and site plan for formwork erection. Completed |
Evidence:
|
Slip form formwork positioning is located to predetermined set out. Completed |
Evidence:
|
Assemble core form system.
|
|
Internal prefabricated system wall form shutters are erected and fixed into location according to engineer's drawings. Completed |
Evidence:
|
System is fitted to concrete nib walls to heights consistent with engineer's requirements. Completed |
Evidence:
|
Shear key feet are installed to manufacturer specifications. Completed |
Evidence:
|
Platforms and assembly are fitted into core to manufacturer specifications. Completed |
Evidence:
|
Structural steel system grid work and hydraulic hose lines are fitted to manufacturer specifications. Completed |
Evidence:
|
Wall form shutters are suspended and system cladding and platforms are fitted and completed to manufacturer specifications and engineer's requirements. Completed |
Evidence:
|
Locate and install penetrations.
|
|
Locations and dimensions of penetrations are set out in accordance with designated tolerance from engineering drawings. Completed |
Evidence:
|
Penetrations, block-outs and cast-in services are constructed where required to engineering drawings. Completed |
Evidence:
|
Penetrations are installed to requirements of engineering drawings. Completed |
Evidence:
|
Conduct slip system.
|
|
External prefabricated system wall shutters are erected and fixed to engineer's and manufacturer specifications. Completed |
Evidence:
|
Shutters are loosened and stripped according to manufacturer's and OHS requirements. Completed |
Evidence:
|
Rigger is communicated with to activate electrical/hydraulic jacking of the system to the new position. Completed |
Evidence:
|
Trailing platforms are installed to engineer's specifications. Completed |
Evidence:
|
Formwork is dismantled in accordance with manufacturer and engineer's specifications. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|