The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. Completed |
Evidence:
|
Prepare site for installation.
|
|
Location of curtain wall installation connections are set out to job drawings and specifications. Completed |
Evidence:
|
Area below construction face is cleared and isolated with designed barricade to OHS regulations and job work plans allowing for support plant and equipment. Completed |
Evidence:
|
Surface of structure to receive curtain walling is inspected for conformity and surface is prepared to receive fixings according to job drawings and specifications. Completed |
Evidence:
|
Install curtain walling.
|
|
Curtain wall fixing brackets are checked or installed to set out points in accordance with manufacturer specifications and site structural drawings. Completed |
Evidence:
|
Curtain walling is located and fixed into correct position in accordance with job drawings, after being raised to location by crane operations. Completed |
Evidence:
|
Curtain walling is installed plumb and level and aligned and finally fixed into position in accordance with specifications. Completed |
Evidence:
|
Junctions between placed sections of curtain walling are fitted and secured to fixing specifications. Completed |
Evidence:
|
Curtain wall trims are installed in accordance with manufacturer specifications and detail drawings, where applicable. Completed |
Evidence:
|
Seal curtain walling.
|
|
Surface areas are cleaned in preparation for application of caulking sealants. Completed |
Evidence:
|
Sealants are applied to curtain walling and trims, where specified, in accordance with job specifications. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|