Evidence Guide: CPCCCO3041 - Place concrete

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCCO3041 - Place concrete

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to place concrete.

  1. Review and clarify task to place concrete.
  2. Assess work site to determine scope of work.
  3. Review task specifications and check to make sure they are in accordance with legislation, regulations and codes of practice.
  4. Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies.
  5. Identify safety signage and barricade requirements.
  6. Review environmental requirements for the task in accordance with environmental plans and legislative requirements.
  7. Select plant, tools and equipment, check for serviceability and rectify or report any faults.
  8. Calculate material quantity requirements, including the volume of concrete.
  9. Estimate the time required for concrete pour based on size of area to be concreted, volume of concrete required and level of complexity of concrete pour.
Review and clarify task to place concrete.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess work site to determine scope of work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review task specifications and check to make sure they are in accordance with legislation, regulations and codes of practice.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify safety signage and barricade requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review environmental requirements for the task in accordance with environmental plans and legislative requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select plant, tools and equipment, check for serviceability and rectify or report any faults.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Calculate material quantity requirements, including the volume of concrete.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Estimate the time required for concrete pour based on size of area to be concreted, volume of concrete required and level of complexity of concrete pour.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare location for concrete placement.

  1. Erect identified safety signage and barricades to maintain a safe working area around pour location and fit personal protective equipment (PPE).
  2. Determine location for concrete placement from task specifications.
  3. Discuss implications for concrete placement near existing structures with relevant personnel and define separation or connection requirements.
  4. Check that location for placement is free of debris and waste.
  5. Ensure site access is clear.
Erect identified safety signage and barricades to maintain a safe working area around pour location and fit personal protective equipment (PPE).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine location for concrete placement from task specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Discuss implications for concrete placement near existing structures with relevant personnel and define separation or connection requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that location for placement is free of debris and waste.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure site access is clear.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Receive concrete.

  1. Check delivery advice for accuracy against order.
  2. Direct concrete delivery vehicle to location of discharge.
  3. Monitor concrete discharged via chute into appropriate receptacle.
Check delivery advice for accuracy against order.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Direct concrete delivery vehicle to location of discharge.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor concrete discharged via chute into appropriate receptacle.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place concrete.

  1. Place concrete in horizontal layers into location in accordance with indicated levels.
  2. Ensure vertical drop of concrete is less than two metres to avoid segregation of concrete materials.
  3. Consolidate poured concrete during process using approved compaction or vibration method.
  4. Carry out measurements and calculations throughout the pour to ensure sufficient concrete is delivered to fill required area, and place orders for any shortfall as required.
  5. Check finished levels against datum using levelling device, and rectify incorrect levels.
  6. Screed concrete to required levels and grades.
Place concrete in horizontal layers into location in accordance with indicated levels.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure vertical drop of concrete is less than two metres to avoid segregation of concrete materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Consolidate poured concrete during process using approved compaction or vibration method.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out measurements and calculations throughout the pour to ensure sufficient concrete is delivered to fill required area, and place orders for any shortfall as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check finished levels against datum using levelling device, and rectify incorrect levels.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Screed concrete to required levels and grades.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up after placing concrete.

  1. Clear work area and dispose of, reuse or recycle materials in accordance with legislation, regulations, codes of practice and task requirements.
  2. Clean, check, maintain and store plant, tools and equipment in accordance with manufacturers’ specifications and workplace requirements.
Clear work area and dispose of, reuse or recycle materials in accordance with legislation, regulations, codes of practice and task requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment in accordance with manufacturers’ specifications and workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 