The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan job.
|
|
Task to be undertaken is assessed Completed |
Evidence:
|
Potential workplace hazards are identified Completed |
Evidence:
|
Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment Completed |
Evidence:
|
Site information is obtained Completed |
Evidence:
|
All forces and loads associated with erecting and dismantling structures and associated plant are considered in consultation with appropriate personnel. Completed |
Evidence:
|
Rigging equipment and associated equipment are identified in consultation with appropriate personnel according to procedures and site information. Completed |
Evidence:
|
Safety equipment is identified. Completed |
Evidence:
|
Appropriate communication methods are identified with appropriate personnel. Completed |
Evidence:
|
Select and inspect equipment.
|
|
Rigging equipment and associated equipment are selected and inspected according to procedures and the appropriate standard. Completed |
Evidence:
|
Safety equipment is selected and inspected according to procedures. Completed |
Evidence:
|
All defective rigging equipment, associated equipment and safety equipment is isolated, reported and recorded according to procedures. Completed |
Evidence:
|
Communication equipment is selected and inspected for serviceability (where applicable) Completed |
Evidence:
|
Set up tasks.
|
|
Appropriate hazard prevention/control measures are applied to the work area according to procedures. Completed |
Evidence:
|
Ground suitability is inspected and checked (where appropriate). Completed |
Evidence:
|
Site information is reviewed, interpreted and communicated to appropriate personnel and appropriate personnel. Completed |
Evidence:
|
All forces and loads associated with erecting and dismantling structures and associated plant are determined in consultation with appropriate personnel. Completed |
Evidence:
|
Safety equipment is fitted and worn correctly (where appropriate). Completed |
Evidence:
|
Rigging equipment and associated plant are positioned for work application and stability according to procedures. Completed |
Evidence:
|
Erect structures and plant.
|
|
Structures and associated plant is erected according to procedures and site information. Completed |
Evidence:
|
Stability of structures and associated plant is maintained during erection according to procedures. Completed |
Evidence:
|
Work is conducted safely at heights including safe and effective use of safety equipment. Completed |
Evidence:
|
Appropriate communication methods and communication equipment, are used to co-ordinate the tasks. Completed |
Evidence:
|
Temporary guys, ties, propping and shoring, including flexible steel wire rope, and tubing, are connected where required. Completed |
Evidence:
|
Associated plant and rigging equipment is used according to procedures and the appropriate standard. Completed |
Evidence:
|
Associated equipment is used in a safe and appropriate manner. Completed |
Evidence:
|
The completed task is inspected according to the appropriate standard. Completed |
Evidence:
|
Excess materials are removed from the work area (where applicable) Completed |
Evidence:
|
Dismantle structures and plant.
|
|
Structures and associated plant are dismantled according to procedures and the appropriate standard. Completed |
Evidence:
|
Work is conducted safely at heights including safe and effective use of safety equipment. Completed |
Evidence:
|
Stability of structures and associated plant is maintained during dismantling according to procedures. Completed |
Evidence:
|
Rigging equipment, associated equipment, safety equipment and associated plant are inspected for damage and defects Completed |
Evidence:
|
All defective rigging equipment, associated equipment, associated plant and safety equipment are isolated reported and recorded according to procedures. Completed |
Evidence:
|
Rigging equipment and associated equipment are stored according to procedures and the appropriate standard. Completed |
Evidence:
|
Hazard prevention/control measures are removed (where appropriate) Completed |
Evidence:
|