The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans and specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied. Completed |
Evidence:
|
Install blanket insulation to walls.
|
|
Stud configuration is identified for installation processes. Completed |
Evidence:
|
Safety wire mesh is installed to plans and specifications. Completed |
Evidence:
|
Insulating blanket is installed in full length runs where practicable or, if joined, joints are made at centre of frame member, according to plans and specifications. Completed |
Evidence:
|
Adjacent runs of blanket insulation is abutted with closed joints. Completed |
Evidence:
|
Install acoustic systems.
|
|
Acoustic materials are selected to manufacturer specifications for the walls and ceiling. Completed |
Evidence:
|
Sheeting or ceiling tile material is selected for use in buildings requiring acoustic properties in accordance with manufacturers' weighted sound reduction index (RW rating). Completed |
Evidence:
|
Plaster sheeting and acoustic tile materials are fixed to walls and ceiling in accordance with specifications. Completed |
Evidence:
|
Sealant is selected and used to manufacturer specifications. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|