Evidence Guide: CPCCSF2004 - Place and fix reinforcement materials

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCSF2004 - Place and fix reinforcement materials

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to place and fix reinforcement materials.

  1. Review and clarify task to place and fix reinforcement materials.
  2. Review task specifications and check to make sure they are in accordance with legislation, regulations and codes of practice.
  3. Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies.
  4. Identify safety signage and barricade requirements.
  5. Review environmental requirements for the task in accordance with environmental plans and legislative requirements.
  6. Select plant, tools and equipment, check for serviceability and rectify or report any faults.
  7. Check stock of reinforcement materials for correct type, quality and quantities against reinforcement schedule and details in plans/specifications.
  8. Acquire materials for the task and locate them safely ready for use.
Review and clarify task to place and fix reinforcement materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review task specifications and check to make sure they are in accordance with legislation, regulations and codes of practice.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify safety signage and barricade requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review environmental requirements for the task in accordance with environmental plans and legislative requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select plant, tools and equipment, check for serviceability and rectify or report any faults.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check stock of reinforcement materials for correct type, quality and quantities against reinforcement schedule and details in plans/specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Acquire materials for the task and locate them safely ready for use.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for reinforcement placement.

  1. Erect identified safety signage and barricades, and fit personal protective equipment (PPE).
  2. Check formwork for completion and conformity to receive reinforcement.
  3. Cut and bend reinforcement bars to required set out and plans and specifications.
  4. Tie bars to designed configuration from plans and specifications.
  5. Cut reinforcement sheets to required sizes.
  6. Attach stiffening rods to panels as required to facilitate handling processes.
  7. Locate bar chairs and spacers to requirements of reinforcement schedule, plans and specifications.
Erect identified safety signage and barricades, and fit personal protective equipment (PPE).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check formwork for completion and conformity to receive reinforcement.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cut and bend reinforcement bars to required set out and plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tie bars to designed configuration from plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cut reinforcement sheets to required sizes.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Attach stiffening rods to panels as required to facilitate handling processes.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate bar chairs and spacers to requirements of reinforcement schedule, plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place and fix reinforcement.

  1. Place fabric reinforcement sheets into position in accordance with engineering drawings and specifications.
  2. Locate and position reinforcement bars in accordance with engineering drawings and specifications.
  3. Locate and place reinforcement using bar chairs, ligatures and spacers in accordance with engineering drawings and specifications.
  4. Support and secure reinforcement material into position in accordance with engineering drawings and specifications.
  5. Secure cast-in items to reinforcement in accordance with engineering drawings and specifications.
  6. Cover and protect ends of protruding reinforcement material in accordance with plans and specifications.
Place fabric reinforcement sheets into position in accordance with engineering drawings and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate and position reinforcement bars in accordance with engineering drawings and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate and place reinforcement using bar chairs, ligatures and spacers in accordance with engineering drawings and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Support and secure reinforcement material into position in accordance with engineering drawings and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Secure cast-in items to reinforcement in accordance with engineering drawings and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cover and protect ends of protruding reinforcement material in accordance with plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check reinforcement prior to concrete pour.

  1. Check location and position of reinforcement, and of fixing ties to reinforcement for accuracy.
  2. Check depth of coverage, clearance, spacing and overlap of reinforcement material in accordance with engineering drawings and job specification.
Check location and position of reinforcement, and of fixing ties to reinforcement for accuracy.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check depth of coverage, clearance, spacing and overlap of reinforcement material in accordance with engineering drawings and job specification.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up after placing and fixing reinforcement materials.

  1. Clear work area and dispose of, reuse or recycle materials in accordance with legislation, regulations, codes of practice and task requirements.
  2. Clean, check, maintain and store plant, tools and equipment in accordance with manufacturers’ specifications and workplace requirements.
Clear work area and dispose of, reuse or recycle materials in accordance with legislation, regulations, codes of practice and task requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment in accordance with manufacturers’ specifications and workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 