Evidence Guide: CPCCWP5001 - Design below ground waterproofing

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCWP5001 - Design below ground waterproofing

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare.

  1. Determine the use of the area and most appropriate form of the waterproofing system, including proposed finishes in accordance with stakeholder needs.
  2. Determine site conditions and plan a basement waterproofing brief in consultation with all stakeholders identifying challenges and waterproofing system design requirements.
  3. Assess types of construction proposed and their permeability to water and moisture, including concrete, masonry and framing to be managed and identify potential water ingress points.
  4. Review drainage system requirements in accordance with the design team.
Determine the use of the area and most appropriate form of the waterproofing system, including proposed finishes in accordance with stakeholder needs.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine site conditions and plan a basement waterproofing brief in consultation with all stakeholders identifying challenges and waterproofing system design requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess types of construction proposed and their permeability to water and moisture, including concrete, masonry and framing to be managed and identify potential water ingress points.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review drainage system requirements in accordance with the design team.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out design.

  1. Identify and assess below ground waterproofing systems available to suit the design that is appropriate for the conditions and in line with the risk analysis.
  2. Provide detailed design drawings for the installation of the waterproofing system, including factors such as building construction method and construction sequencing, substrate considerations and compatibility with the waterproofing system and other related building elements in accordance with stakeholder needs.
  3. Provide a basement waterproofing requirement and specification in accordance with the agreed waterproofing design brief and stakeholder needs.
  4. Carry out a review of and ensure compliance with relevant regulations, National Construction Code (NCC) performance requirements, Australian Standards, work health and safety (WHS), environmental requirements and manufacturers’ requirements.
  5. Carry out a safety in design analysis of the proposed waterproofing system.
  6. Provide quality assurance inspection protocols for the waterproofing installation, including substrate assessment for suitability, compliance of membrane installation with project specifications, completion inspection processes and repair and maintenance plan.
  7. Produce and submit design to stakeholders.
  8. Determine the use of the area and most appropriate form of the waterproofing system, including proposed finishes in accordance with stakeholder needs.
Identify and assess below ground waterproofing systems available to suit the design that is appropriate for the conditions and in line with the risk analysis.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide detailed design drawings for the installation of the waterproofing system, including factors such as building construction method and construction sequencing, substrate considerations and compatibility with the waterproofing system and other related building elements in accordance with stakeholder needs.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide a basement waterproofing requirement and specification in accordance with the agreed waterproofing design brief and stakeholder needs.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out a review of and ensure compliance with relevant regulations, National Construction Code (NCC) performance requirements, Australian Standards, work health and safety (WHS), environmental requirements and manufacturers’ requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out a safety in design analysis of the proposed waterproofing system.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide quality assurance inspection protocols for the waterproofing installation, including substrate assessment for suitability, compliance of membrane installation with project specifications, completion inspection processes and repair and maintenance plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce and submit design to stakeholders.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine the use of the area and most appropriate form of the waterproofing system, including proposed finishes in accordance with stakeholder needs.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine site conditions and plan a basement waterproofing brief in consultation with all stakeholders identifying challenges and waterproofing system design requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess types of construction proposed and their permeability to water and moisture, including concrete, masonry and framing to be managed and identify potential water ingress points.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review drainage system requirements in accordance with the design team.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out risk analysis.

  1. Assess risk of water bearing to full extent of the structure and the effects of hydrostatic pressure on the proposed waterproofing system.
Assess risk of water bearing to full extent of the structure and the effects of hydrostatic pressure on the proposed waterproofing system.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess risks of possible defects in the waterproofing system.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess consequence of water and moisture ingress into an area of the basement.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine the risk of internal condensation and control measures with the design team.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine feasibility of the proposed waterproofing design for the structure and the construction sequence.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review any requirement for repair and maintenance of the waterproofing system post construction.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse site environmental conditions according to approved plans, including surface and sub-surface drainage.

  1. Identify and assess below ground waterproofing systems available to suit the design that is appropriate for the conditions and in line with the risk analysis.
Identify and assess below ground waterproofing systems available to suit the design that is appropriate for the conditions and in line with the risk analysis.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide a basement waterproofing requirement and specification in accordance with the agreed waterproofing design brief and stakeholder needs.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out a review of and ensure compliance with relevant regulations, National Construction Code (NCC) performance requirements, Australian Standards, work health and safety (WHS), environmental requirements and manufacturers’ requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out a safety in design analysis of the proposed waterproofing system.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide quality assurance inspection protocols for the waterproofing installation, including substrate assessment for suitability, compliance of membrane installation with project specifications, completion inspection processes and repair and maintenance plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce and submit design to stakeholders.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge