The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Plans and specifications are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with the installation of on-site disposal systems, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements are identified and adhered to in accordance with workplace requirements. Completed |
Evidence:
|
Tasks are planned and sequenced in conjunction with others involved in or affected by the work. Completed |
Evidence:
|
Tools and equipment, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area is prepared to support efficient installation of the on-site disposal system. Completed |
Evidence:
|
Identify work requirements.
|
|
Position of on-site disposal system is determined in accordance with plans, specifications, authorities' requirements and relevant Australian standards. Completed |
Evidence:
|
Quantity and type of materials required are calculated from design drawings and specifications in compliance with relevant Australian standards and local authorities' requirements. Completed |
Evidence:
|
Materials are identified, ordered and collected in accordance with workplace procedures. Completed |
Evidence:
|
Materials are checked for compliance with docket and order form, and for acceptable condition. Completed |
Evidence:
|
Install on-site disposal system.
|
|
Set out is checked for compliance with plans, specifications and authorities' requirements. Completed |
Evidence:
|
Underground services within excavation area are identified and marked. Completed |
Evidence:
|
Site is excavated in accordance with requirements for system, plans, permits and site requirements, ensuring minimum damage to surrounding structures or environment. Completed |
Evidence:
|
On-site effluent disposal system is installed in accordance with plans, specifications, relevant Australian standards and regulatory requirements. Completed |
Evidence:
|
Sustainability principles and concepts are applied throughout the installation. Completed |
Evidence:
|
System is checked for compliance with relevant Australian standards and regulatory authorities' requirements and correct operation. Completed |
Evidence:
|
Clean up.
|
|
Excavation is backfilled to specifications and work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Information is accessed and documentation completed in accordance with responsible authority and workplace requirements. Completed |
Evidence:
|