The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Identify requirements for gas pressure control equipment.
|
|
Plans, specifications and any special instructions are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with installing gas pressure control and regulating equipment, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements for company operations are identified and adhered to. Completed |
Evidence:
|
Gas load and design requirements are determined from design drawing or workplace instructions. Completed |
Evidence:
|
Available gas pressure is measured and suitability of supply determined. Completed |
Evidence:
|
Calculations are recorded in format required by job specification or workplace requirements. Completed |
Evidence:
|
Selected gas pressure controls and regulator, specified locations and venting requirements are checked for compliance against standards and workplace requirements. Completed |
Evidence:
|
Quantity and type of materials are estimated from design drawing or on-site dimensions. Completed |
Evidence:
|
Materials, pipe fittings and components are selected to comply with standards and regulatory authorities' requirements. Completed |
Evidence:
|
Prepare for installation.
|
|
Materials, equipment and cylinders are ordered and checked for compliance with docket and order form, and for acceptable condition. Completed |
Evidence:
|
Appropriate tools and equipment for the installation, including personal protective equipment, are identified and selected. Completed |
Evidence:
|
Work is planned in conjunction with others involved in or affected by the work. Completed |
Evidence:
|
Work area and materials are prepared to support efficient installation of equipment. Completed |
Evidence:
|
Install and commission control and regulating equipment.
|
|
Gas control and regulating equipment is installed in compliance with standards and statutory and regulatory authority requirements. Completed |
Evidence:
|
Appropriate test apparatus is selected for commissioning the control and regulating equipment. Completed |
Evidence:
|
Commissioning is carried out in accordance with standards, and authorities' and manufacturer requirements, and the commissioning data is recorded in format required by the authority or job specification. Completed |
Evidence:
|
Pressure is correctly adjusted to comply with standards and job specification. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of or recycled in accordance with state and territory legislation and workplace procedures. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Information is accessed and documentation completed in accordance with workplace requirements. Completed |
Evidence:
|