The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Site survey is conducted of proposed irrigation area in accordance with client requirements. Completed |
Evidence:
|
Safety (OHS) requirements associated with design of domestic irrigation systems, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements are identified and adhered to in accordance with workplace requirements. Completed |
Evidence:
|
Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements. Completed |
Evidence:
|
Tools and equipment for preparing basic irrigation designs and drawings, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area is prepared to support efficient design of domestic irrigation systems. Completed |
Evidence:
|
Identify drawing requirements.
|
|
Areas requiring irrigation and system design components are identified. Completed |
Evidence:
|
Information is obtained on the soil type, ground slope, contours and prevailing wind. Completed |
Evidence:
|
Underground cables and services, buildings, paths and other permanent structures are located and noted. Completed |
Evidence:
|
Water supply is located and its influence on design requirements is determined. Completed |
Evidence:
|
Appropriate emitters are selected to suit function and design requirements. Completed |
Evidence:
|
Install and commission irrigation system.
|
|
Site plan is drawn to include structures, paths and property boundaries. Completed |
Evidence:
|
Garden areas are sketched to include locations of lawns, garden beds, trees, vegetable patches or ferneries. Completed |
Evidence:
|
Pipe runs and water emitters are sketched to design requirements. Completed |
Evidence:
|
Sizes of pipes are calculated using standard data and information is recorded in required format. Completed |
Evidence:
|
List of materials is compiled to include number and type of water emitters, control valves, quantities of pipes, fittings and components. Completed |
Evidence:
|
Drawing and design are submitted to client for approval and adjusted. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of or recycled in accordance with state and territory legislation and workplace procedures. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Documentation is completed in accordance with workplace requirements. Completed |
Evidence:
|