The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Plans and specifications are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with selecting and installing insulating sheathing, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements are identified and adhered to in accordance with workplace requirements. Completed |
Evidence:
|
Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements. Completed |
Evidence:
|
Tools and equipment, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area is prepared to support efficient selection and installation of insulating sheathing. Completed |
Evidence:
|
Identify insulation requirements.
|
|
Insulation materials are selected that comply with plans, specifications and relevant information. Completed |
Evidence:
|
Quantity and type of materials required are calculated from plans and specifications. Completed |
Evidence:
|
Allowances for fabrication and assembly are determined. Completed |
Evidence:
|
Materials are identified, ordered and collected in accordance with workplace procedures. Completed |
Evidence:
|
Materials are checked for compliance with docket and order form and for acceptable condition, and faults are reported. Completed |
Evidence:
|
Install insulation.
|
|
Surfaces to be insulated are cleaned of dirt, rust, scale and grease. Completed |
Evidence:
|
Insulating materials, including metal sheathing, are installed in accordance with plans and specifications. Completed |
Evidence:
|
Vapour barriers are applied to suit job requirements. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of or recycled in accordance with state and territory legislation and workplace procedures. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Documentation is completed in accordance with workplace requirements. Completed |