The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Evaluate design parameters.
|
|
Scope of work is established for gas bulk storage systems for a range of projects. Completed |
Evidence:
|
Design requirements are determined from plans, specifications and client briefs. Completed |
Evidence:
|
Cost-benefit analysis is conducted comparing a range of pipe materials and system designs. Completed |
Evidence:
|
Statutory and regulatory requirements and Australian and New Zealand standards for the design of gas bulk storage systems are analysed and applied. Completed |
Evidence:
|
Manufacturer requirements and trade and technical manuals are interpreted. Completed |
Evidence:
|
Additional research, including a desktop study, is conducted to outline design parameters. Completed |
Evidence:
|
Performance requirements are established. Completed |
Evidence:
|
Plan and detail system components.
|
|
Layout of a liquefied petroleum gas (LPG) bulk storage installation is determined in accordance with regulatory authorities. Completed |
Evidence:
|
Site plans for bulk installations are prepared, including layout of pipework systems. Completed |
Evidence:
|
Fire protection systems are specified in accordance with Australian and New Zealand standards and deluge systems are detailed. Completed |
Evidence:
|
Control valves and fittings are designed and detailed. Completed |
Evidence:
|
Content gauges are analysed and located in accordance with code requirements, and meters and regulators are specified. Completed |
Evidence:
|
Vaporisers are evaluated and specified and vaporisation rates are calculated. Completed |
Evidence:
|
System calculations are performed for a range of applications in accordance with regulations and manufacturer requirements. Completed |
Evidence:
|
Pipe fixings are designed for a range of applications. Completed |
Evidence:
|
Approved materials, jointing methods and installation requirements for gas bulk storage systems are specified. Completed |
Evidence:
|
Design and size systems.
|
|
Gas bulk storage systems and circuits are designed for a range of applications. Completed |
Evidence:
|
Deluge systems are designed. Completed |
Evidence:
|
Gas bulk storage systems are designed and sized using computer software packages. Completed |
Evidence:
|
Prepare documentation.
|
|
Plans are prepared for a range of gas bulk storage systems. Completed |
Evidence:
|
Specification for a gas bulk storage system is prepared. Completed |
Evidence:
|
Testing and commissioning schedule is prepared. Completed |
Evidence:
|
Operation and maintenance manual is produced. Completed |
Evidence:
|