Evidence Guide: CPCPRE2003 - Grout prefabricated concrete elements

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCPRE2003 - Grout prefabricated concrete elements

What evidence can you provide to prove your understanding of each of the following citeria?

Access requirements to grout prefabricated concrete elements.

  1. Review and clarify grouting task and accessibility to enable the grouting to be placed in accordance with the erection prefabricated design documentation and material data sheets.
  2. Review erection design documentation for task specifications and check to make sure they are in accordance with regulations, standards and codes of practice.
  3. Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies.
  4. Identify safety signage and barricade requirements.
  5. Review environmental requirements for the task in accordance with environmental plans and legislative requirements.
  6. Access plant, tools, equipment and materials required to carry out task.
  7. Locate the joints and confirm safety requirements, including working aloft, fall protection
Review and clarify grouting task and accessibility to enable the grouting to be placed in accordance with the erection prefabricated design documentation and material data sheets.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review erection design documentation for task specifications and check to make sure they are in accordance with regulations, standards and codes of practice.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify safety signage and barricade requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review environmental requirements for the task in accordance with environmental plans and legislative requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Access plant, tools, equipment and materials required to carry out task.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate the joints and confirm safety requirements, including working aloft, fall protection

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare to grout prefabricated concrete elements.

  1. Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE).
  2. Obtain plant, tools, equipment, check for serviceability and rectify or report any faults.
  3. Identify materials and associated quantities/measurements required for grouting according to specifications and material data sheets.
  4. Review the erection design documentation and the material data sheets and check if removal of shims or levelling packers are required after initial grouting has cured.
  5. Review the erection design documentation and the material data sheets to verify which gaps are to be grouted.
Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain plant, tools, equipment, check for serviceability and rectify or report any faults.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify materials and associated quantities/measurements required for grouting according to specifications and material data sheets.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review the erection design documentation and the material data sheets and check if removal of shims or levelling packers are required after initial grouting has cured.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review the erection design documentation and the material data sheets to verify which gaps are to be grouted.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mix flowable grout.

  1. Establish the volume of flowable grout required and mix in accordance with specifications and material data sheet to ensure it is the desired consistency so as to be free flowing and bleed from grout breathers and/or flow tubes.
  2. Check that all grout tubes, breathers and areas to be grout filled are clear and free from debris, contaminants and/or loose materials.
  3. Check the grout mixture for the desired consistency and flow property and adjust accordingly in accordance with the erection design documentation and the material data sheets.
Establish the volume of flowable grout required and mix in accordance with specifications and material data sheet to ensure it is the desired consistency so as to be free flowing and bleed from grout breathers and/or flow tubes.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that all grout tubes, breathers and areas to be grout filled are clear and free from debris, contaminants and/or loose materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the grout mixture for the desired consistency and flow property and adjust accordingly in accordance with the erection design documentation and the material data sheets.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review erection design documentation for task specifications and check to make sure they are in accordance with regulations, standards and codes of practice.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify safety signage and barricade requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review environmental requirements for the task in accordance with environmental plans and legislative requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Access plant, tools, equipment and materials required to carry out task.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate the joints and confirm safety requirements, including working aloft, fall protection

  1. Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE).
Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain plant, tools, equipment, check for serviceability and rectify or report any faults.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify materials and associated quantities/measurements required for grouting according to specifications and material data sheets.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review the erection design documentation and the material data sheets and check if removal of shims or levelling packers are required after initial grouting has cured.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review the erection design documentation and the material data sheets to verify which gaps are to be grouted.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mix dry pack or trowelable grout.

  1. Check the erection design documentation and the material data sheets to confirm compliance with compressive and tensile strength grout requirements.
Check the erection design documentation and the material data sheets to confirm compliance with compressive and tensile strength grout requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish the volume of dry pack grout required and mix in accordance with specifications and material data sheet to ensure it is the desired consistency.

  1. Establish the volume of flowable grout required and mix in accordance with specifications and material data sheet to ensure it is the desired consistency so as to be free flowing and bleed from grout breathers and/or flow tubes.
Establish the volume of flowable grout required and mix in accordance with specifications and material data sheet to ensure it is the desired consistency so as to be free flowing and bleed from grout breathers and/or flow tubes.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that all grout tubes, breathers and areas to be grout filled are clear and free from debris, contaminants and/or loose materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the grout mixture for the desired consistency and flow property and adjust accordingly in accordance with the erection design documentation and the material data sheets.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare prefabricated concrete joint and apply grouting.

  1. Ensure that all prefabricated concrete joint surfaces are prepared in accordance with the specifications and material data sheets.
Ensure that all prefabricated concrete joint surfaces are prepared in accordance with the specifications and material data sheets.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure all surfaces are clean, sound and free from dust, oils or other contaminants.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare the grouting surface in accordance with the erection design documentation and the material data sheets.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Seal perimeter of the area to be grouted in accordance with specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply grout in accordance with the project specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that dry pack or trowelable grout is placed in a manner that ensures consolidation by tamping/rodding to eliminate any air voids.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Once complete, compare the actual volume of grout to the calculated volume of grout required to ensure no blockage and/or air voids have formed.

  1. Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements.
Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store tools and equipment in accordance with manufacturer and workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge