Evidence Guide: CPCPRE3000 - Lift and place prefabricated concrete elements

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCPRE3000 - Lift and place prefabricated concrete elements

What evidence can you provide to prove your understanding of each of the following citeria?

Determine the requirements to lift, place and unload prefabricated concrete elements.

  1. Determine the requirements to lift and place prefabricated concrete elements from the erection design documentation and check that they are in accordance with AS 3850 Prefabricated concrete elements.
  2. Review and clarify prefabricated concrete installation task.
  3. Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies.
  4. Conduct working at heights risk assessment and follow appropriate WHS processes.
  5. Identify safety signage and barricade requirements.
  6. Review environmental requirements for the task in accordance with environmental plans and legislative requirements.
  7. Assess and apply environmental factors, including ground conditions, road permits, and public and vehicle access to carry out task.
  8. Hook-up concrete elements prior to unchaining from the supporting frames/trailer, ensuring other panels on the trailer are still separately restrained.
  9. Determine plant, tools, rigging equipment and support requirements to carry out task.
  10. Determine the location of prefabricated concrete element installation from set-out drawings.
Determine the requirements to lift and place prefabricated concrete elements from the erection design documentation and check that they are in accordance with AS 3850 Prefabricated concrete elements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review and clarify prefabricated concrete installation task.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct working at heights risk assessment and follow appropriate WHS processes.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify safety signage and barricade requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review environmental requirements for the task in accordance with environmental plans and legislative requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess and apply environmental factors, including ground conditions, road permits, and public and vehicle access to carry out task.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hook-up concrete elements prior to unchaining from the supporting frames/trailer, ensuring other panels on the trailer are still separately restrained.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine plant, tools, rigging equipment and support requirements to carry out task.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine the location of prefabricated concrete element installation from set-out drawings.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Comply with prefabricated concrete element erection requirements.

  1. Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE).
  2. Obtain plant, tools, equipment, check for serviceability and rectify or report any faults.
  3. Check all lifting equipment components to ensure that they are compatible and meet all of the requirements of AS 3850 Prefabricated concrete elements and are correctly marked with working load limit (WLL).
  4. Check lifting and rigging equipment to ensure that they match the specifications set out in the erection documentation and manufacturer specifications.
  5. Check lifting and rigging equipment to ensure they are serviceable and if not, quarantine, report faulty items and replace with new equipment.
  6. Check that the erection documentation and erection drawings or concrete element shop drawings, provide rigging configurations and all required information as set out in AS 3850 Prefabricated concrete elements.
  7. Ensure that erection documentation is on-site, available to the erectors and the requirements are fully understood.
  8. Check that the brace fixings installers have been trained and are experienced in the installation of the specified fixing in accordance with the requirements of AS 3850 Prefabricated concrete elements.
Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain plant, tools, equipment, check for serviceability and rectify or report any faults.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check all lifting equipment components to ensure that they are compatible and meet all of the requirements of AS 3850 Prefabricated concrete elements and are correctly marked with working load limit (WLL).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check lifting and rigging equipment to ensure that they match the specifications set out in the erection documentation and manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check lifting and rigging equipment to ensure they are serviceable and if not, quarantine, report faulty items and replace with new equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that the erection documentation and erection drawings or concrete element shop drawings, provide rigging configurations and all required information as set out in AS 3850 Prefabricated concrete elements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that erection documentation is on-site, available to the erectors and the requirements are fully understood.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that the brace fixings installers have been trained and are experienced in the installation of the specified fixing in accordance with the requirements of AS 3850 Prefabricated concrete elements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare to lift, place and support prefabricated concrete elements.

  1. Review erection plan and determine job sequencing and team roles, including supervision and confirm with builder and crane operator that the crane set-up is clearly detailed in the erection documentation.
  2. Confirm load mass and load distribution of element to be lifted.
  3. Assemble the rigging and confirm that the rigging configuration is in accordance with the rigging diagrams set out in the erection design documentation.
  4. Check that the position of the temporary supports (braces and/or props) are in accordance with the erection design documentation.
  5. Position levelling shims/packers to the nominated reduced level (RL) in accordance with the erection design documentation.
  6. Check that any temporary supports and/or strong backs attached to the elements have been secured in accordance with the erection design documentation and safety standards.
  7. Attach the compatible lifting devices to the lifting inserts embedded in the prefabricated concrete element in accordance with the manufacturer specifications.
  8. Check that the included angle of the rigging is in accordance with the acceptable limits as set out in AS 3850 Prefabricated concrete elements.
  9. Ensure all personnel are clear of the drop zone.
Review erection plan and determine job sequencing and team roles, including supervision and confirm with builder and crane operator that the crane set-up is clearly detailed in the erection documentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm load mass and load distribution of element to be lifted.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble the rigging and confirm that the rigging configuration is in accordance with the rigging diagrams set out in the erection design documentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that the position of the temporary supports (braces and/or props) are in accordance with the erection design documentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position levelling shims/packers to the nominated reduced level (RL) in accordance with the erection design documentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that any temporary supports and/or strong backs attached to the elements have been secured in accordance with the erection design documentation and safety standards.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Attach the compatible lifting devices to the lifting inserts embedded in the prefabricated concrete element in accordance with the manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that the included angle of the rigging is in accordance with the acceptable limits as set out in AS 3850 Prefabricated concrete elements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure all personnel are clear of the drop zone.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct lifting and placing of prefabricated concrete elements.

  1. Lift and place the load with the crane in accordance with job safety and environmental analysis (JSEA) and safe work method statement (SWMS).
  2. Coordinate with the crane driver to maintain stability of load during lifting, transportation and positioning.
  3. Direct load to landing position in accordance with the erection design documentation and specifications.
  4. Check to ensure that the temporary supports are placed and fixed in accordance with the erection design documentation and safety standards.
  5. Check that the installed component is both level and plumb and in accordance with the set-out drawings and erection design documentation.
  6. When the load has been fully secured and supported by the temporary supports, release the load from the crane, safely access lifting points and disconnect the lifting devices attached to the prefabricated concrete elements.
  7. Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements.
  8. Clean, check, maintain and store tools and equipment in accordance with manufacturer and workplace requirements.
Lift and place the load with the crane in accordance with job safety and environmental analysis (JSEA) and safe work method statement (SWMS).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate with the crane driver to maintain stability of load during lifting, transportation and positioning.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Direct load to landing position in accordance with the erection design documentation and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check to ensure that the temporary supports are placed and fixed in accordance with the erection design documentation and safety standards.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that the installed component is both level and plumb and in accordance with the set-out drawings and erection design documentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

When the load has been fully secured and supported by the temporary supports, release the load from the crane, safely access lifting points and disconnect the lifting devices attached to the prefabricated concrete elements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store tools and equipment in accordance with manufacturer and workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review and clarify prefabricated concrete installation task.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct working at heights risk assessment and follow appropriate WHS processes.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify safety signage and barricade requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review environmental requirements for the task in accordance with environmental plans and legislative requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess and apply environmental factors, including ground conditions, road permits, and public and vehicle access to carry out task.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine plant, tools, rigging equipment and support requirements to carry out task.

  1. Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE).
Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain plant, tools, equipment, check for serviceability and rectify or report any faults.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check lifting and rigging equipment to ensure that they match the specifications set out in the erection documentation and manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check lifting and rigging equipment to ensure they are serviceable and if not, quarantine, report faulty items and replace with new equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that erection documentation is on-site, available to the erectors and the requirements are fully understood.

  1. Review erection plan and determine job sequencing and team roles, including supervision and confirm with builder and crane operator that the crane set-up is clearly detailed in the erection documentation.
Review erection plan and determine job sequencing and team roles, including supervision and confirm with builder and crane operator that the crane set-up is clearly detailed in the erection documentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble the rigging and confirm that the rigging configuration is in accordance with the rigging diagrams set out in the erection design documentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that the position of the temporary supports (braces and/or props) are in accordance with the erection design documentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position levelling shims/packers to the nominated reduced level (RL) in accordance with the erection design documentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure all personnel are clear of the drop zone.

  1. Lift and place the load with the crane in accordance with job safety and environmental analysis (JSEA) and safe work method statement (SWMS).
Lift and place the load with the crane in accordance with job safety and environmental analysis (JSEA) and safe work method statement (SWMS).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate with the crane driver to maintain stability of load during lifting, transportation and positioning.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Direct load to landing position in accordance with the erection design documentation and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check to ensure that the temporary supports are placed and fixed in accordance with the erection design documentation and safety standards.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that the installed component is both level and plumb and in accordance with the set-out drawings and erection design documentation.

  1. Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements.
Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store tools and equipment in accordance with manufacturer and workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge