NTISthis.com

Evidence Guide: CPPSIS5046A - Design a stormwater system

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPPSIS5046A - Design a stormwater system

What evidence can you provide to prove your understanding of each of the following citeria?

Organise resources.

  1. Characteristics of the operating environment and any special equipment or resource requirements are identified according to organisational guidelines.
  2. Equipment is checked to be in good working order.
  3. Manufacturer specifications with regard to the use of equipment are complied with.
Characteristics of the operating environment and any special equipment or resource requirements are identified according to organisational guidelines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is checked to be in good working order.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manufacturer specifications with regard to the use of equipment are complied with.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for this Training Package.

Overview of assessment

This unit of competency could be assessed on its own or in combination with other units relevant to the job function, for example CPPSIS5048A Conduct an engineering survey, CPPSIS5049A Conduct an engineering surveying project, CPPSIS5056A Design road and railway, and CPPSIS5057A Carry out a precision survey.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of:

matching objectives with resources to ensure the design of the stormwater system proceeds in an organised and timely manner

accessing and interpreting design information to identify the components to be measured and monitored

performing measurements

reducing and manipulating survey data

recording and reporting non-conformity aspects

knowledge of stormwater systems.

Specific resources for assessment

Resource implications for assessment include access to:

assessment instruments, including personal planner and assessment record book

assignment instructions, work plans and schedules, policy documents and duty statements

registered training provider of assessment services

relevant guidelines, regulations and codes of practice

suitable venue and equipment.

Access must be provided to appropriate learning and assessment support when required.

Where applicable, physical resources should include equipment modified for people with disabilities.

Context of assessment

Holistic: based on the performance criteria, evidence guide, range statement, and required skills and knowledge.

Method of assessment

Demonstrated over a period of time and observed by the assessor (or assessment team working together to conduct the assessment).

Demonstrated competency in a range of situations, that may include customer/workplace interruptions and involvement in related activities normally experienced in the workplace.

Obtained by observing activities in the field and reviewing induction information. If this is not practicable, observation in realistic simulated environments may be substituted.

Guidance information for assessment

Assessment requires that the clients’ objectives and industry expectations are met. If the clients’ objectives are narrowly defined or not representative of industry needs, it may be necessary to refer to portfolio case studies of a variety of surveying and spatial information services requirements to assess competency.

Oral questioning or written assessment and hypothetical situations (scenarios) may be used to assess underpinning knowledge (in assessment situations where the candidate is offered a preference between oral questioning or written assessment, questions are to be identical).

Supplementary evidence may be obtained from relevant authenticated correspondence from existing supervisors, team leaders or specialist training staff.

All practical demonstration must adhere to the safety and environmental regulations relevant to each State or Territory.

Where assessment is for the purpose of recognition (recognition of current competencies [RCC] or recognition of prior learning [RPL]), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time.

In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge.

Assessment processes will be appropriate to the language and literacy levels of the candidate and any cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.

Required Skills and Knowledge

This section describes the essential skills and knowledge and their level, required for this unit.

Required skills

communication skills to:

consult effectively with clients and colleagues

impart knowledge and ideas through oral, written and visual means

initiative and enterprise skills to:

translate requirements into design

interpret project requirements

literacy skills to:

assess and use workplace information

read and write technical reports

research and evaluate

numeracy skills to:

analyse errors

conduct image analysis

interpret statistics

perform mental calculations

record with accuracy and precision

undertake high level computations

organisational skills to:

coordinate technical and human resource inputs to research activities

prioritise activities to meet contractual requirements

spatial skills to:

exercise precision and accuracy in relation to spatial and aspatial data design

archive and retrieve spatial data

manage and manipulate spatial data

manage files

solve problems relating to height, depth, breadth, dimension, direction and position in actual operational activity and virtual representation

technology skills to:

use computers to complete design documentation

use instruments during system design

Required knowledge

advanced data reduction

calibration of specialised surveying equipment

data formats

engineering-related tasks and associated computations

industry standards relating to stormwater system design

limitations of equipment

organisational policies and guidelines, such as OHS guidelines

planning and control processes

surveying reference systems

surveying data capture and data set out methodologies

stormwater system and associated computations

understanding of errors, accuracy and precision in design

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the performance criteria is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.

Organisational guidelines may include:

appropriate timelines

code of ethics

company policy

final product formats

formal design parameters

legislation relevant to the work or service function

manuals

OHS policies and procedures

personnel practices and guidelines outlining teamwork, work roles and responsibilities

requirements for data processing.

Manufacturer specifications may include:

equipment specifications

operator manuals.

Objectives may include:

agreed client requirements

written survey specifications.

Principal work activities may include:

the survey design of a stormwater system.

Constraints may include:

coverage

datum

environmental factors

industry requirements

legal and statutory

financial

resource availability

time.

Client requirements refer to description of outputs and may be contained in:

contracts

memos

tender briefs

verbal instructions

written instructions.

Relevant personnel may include:

colleagues

registered surveyors

site personnel

staff or employee representatives

supervisors or line managers

suppliers

users.

Techniques may include:

field

office procedures.

Stormwater design may include:

compressibility of fluids

density

division between a solid and a fluid

gravity

intensity of pressure and pressure head

mass

total pressure

weight

surface tension

viscosity

urban.

Calculations may include:

calculations for a two lane rural road, which may include:

cross-sections

grades and levels on grades

grade intersections

high and low points and levels in crosssections

vertical curves, including levels and length

calculations for an urban road, which may include cut and fill volumes

calculation types include:

graphical and mechanical (planimeter) methods

mathematical rules such as mid-ordinate, trapezoidal and offsets at regular and irregular intervals from traverse to irregular boundaries, and radiation for irregular boundaries

volume from contours and spot heights

volume from cross-sections: mean area and end area using trapezoidal, prismoidal and Simpson’s rules

volume of regular objects, such as cone, cylinder, pyramid, wedge, frustum and sphene.

Design type may include:

design details:

digital information

hard copy plans

maps

written instructions

stormwater system details.

Appropriate measurement equipment may include:

manometers

mercury bowl

piezometer.

Different types of flow may include:

open channels

pipes

pipe lines.

Reynolds s number refers to:

a system that calculates the dispersion of solute into a slow stream of solvent.

Channel measurements may include:

channel cross-sections

rectangular

trapezoidal

v-notch.

Elements of meteorology may include:

graphs and charts associated with:

rain gauging

types of rainfall.

OHS may include:

Australian standards

development of site safety plan

identification of potential hazards

inspection of work sites

training staff in OHS requirements

use of personal protective clothing

use of safety equipment and signage.

Legislative requirements may include:

Australian standards

award and enterprise agreements

certification requirements

codes of practice

quality assurance requirements.

Legal and statutory standards may include:

local government requirements

national standards

state statutes and regulations.

Surveying data components may include:

depth

dimension

direction

flow rates

position

slope.

Clients may include:

customers with routine or special requests

external to organisation

internal to organisation

regular and new customers, including:

members of the public

business enterprises

government agencies

suppliers.

Documentation may include:

electronic or paper-based correspondence with client

field records

final report

records of conversation

survey plots

organisational work activity sheets.