Evidence Guide: FBPGRA3004 - Control mill processes and performance

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FBPGRA3004 - Control mill processes and performance

What evidence can you provide to prove your understanding of each of the following citeria?

Maintain mill flow sheet

  1. Identify all breaking, reduction and dressing stages in mill
  2. Show destinations for all stock separations according to operating requirements
  3. Identify all optional and ancillary equipment required to control flour and by-product production
  4. Identify all bins, silos, chutes, conveyors and exhausts that control processes and performance across the mill
Identify all breaking, reduction and dressing stages in mill

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Show destinations for all stock separations according to operating requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify all optional and ancillary equipment required to control flour and by-product production

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify all bins, silos, chutes, conveyors and exhausts that control processes and performance across the mill

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for flour and by-product production

  1. Establish customer requirements for shift or production period
  2. Follow recipe required to meet desired production quality and quantity targets
  3. Check availability of required wheat stock
  4. Determine if any changes to grist stock will be required and plan for changes to settings
Establish customer requirements for shift or production period

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Follow recipe required to meet desired production quality and quantity targets

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check availability of required wheat stock

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine if any changes to grist stock will be required and plan for changes to settings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine break system settings

  1. Adjust break rolls for desired percentage release
  2. Conduct visual inspection and test sieving where required to monitor release percentage
  3. Monitor break roll passages to avoid saturation of later stages
  4. Set bran finishers according to workplace procedures and to ensure optimum performance
  5. Set plansifters for desired grading, including adjusting spaces between plansifters for varying grains and moisture levels
  6. Monitor performance of break system to ensure system is free from semolina
Adjust break rolls for desired percentage release

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct visual inspection and test sieving where required to monitor release percentage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor break roll passages to avoid saturation of later stages

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set bran finishers according to workplace procedures and to ensure optimum performance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set plansifters for desired grading, including adjusting spaces between plansifters for varying grains and moisture levels

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor performance of break system to ensure system is free from semolina

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set settings for purifiers where fitted

  1. Maintain and monitor sieve covers according to workplace procedures and to ensure optimum performance
  2. Monitor feed rate to purifiers according to workplace procedures and to ensure optimum performance
  3. Monitor horizontal and vertical movement of sieve covers
  4. Set and monitor air pressure for each aspiration section
  5. Select destinations for throughs and lifted bran and other particles
  6. Ensure purifier stock is free from flour
Maintain and monitor sieve covers according to workplace procedures and to ensure optimum performance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor feed rate to purifiers according to workplace procedures and to ensure optimum performance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor horizontal and vertical movement of sieve covers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set and monitor air pressure for each aspiration section

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select destinations for throughs and lifted bran and other particles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure purifier stock is free from flour

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set settings for scratch or sizing system

  1. Set scratch equipment or sizing rolls according to operator instructions
  2. Monitor performance of scratch and sizing rolls
Set scratch equipment or sizing rolls according to operator instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor performance of scratch and sizing rolls

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set settings for reduction passages

  1. Set each set of reduction rolls for desired flour and capacity of succeeding reduction passages
  2. Monitor covers on sifters for effective dressing from each reduction roll
  3. Monitor flake disrupters and impact detachers where fitted
  4. Set and monitor reduction settings to achieve required starch damage
  5. Specify collection conveyors and bins for each flour stream
Set each set of reduction rolls for desired flour and capacity of succeeding reduction passages

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor covers on sifters for effective dressing from each reduction roll

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor flake disrupters and impact detachers where fitted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set and monitor reduction settings to achieve required starch damage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Specify collection conveyors and bins for each flour stream

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set settings for final production stages

  1. Specify use of flour divides for blends
  2. Monitor redressing equipment according to workplace procedures
  3. Monitor weighing, infestation destroying, and metal removal equipment according to work health and safety and operating procedures
  4. Send finished flour to packing or storage according to workplace requirements
Specify use of flour divides for blends

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor redressing equipment according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor weighing, infestation destroying, and metal removal equipment according to work health and safety and operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Send finished flour to packing or storage according to workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor mill equipment

  1. Check flutes and rolls for wear and defects
  2. Monitor temperature of reduction rolls and performance of water cooling if used
  3. Check automatic roll adjustment and protection mechanisms are working correctly
  4. Adjust mill settings when required for effect of breakdowns and urgent maintenance
Check flutes and rolls for wear and defects

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor temperature of reduction rolls and performance of water cooling if used

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check automatic roll adjustment and protection mechanisms are working correctly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust mill settings when required for effect of breakdowns and urgent maintenance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor mill performance

  1. Ensure all grain and flour tests are carried out to required schedule and procedures
  2. Adjust settings where required for variation in grain, grist and atmospheric conditions
  3. Monitor milling and invisible loss per production period
Ensure all grain and flour tests are carried out to required schedule and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust settings where required for variation in grain, grist and atmospheric conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor milling and invisible loss per production period

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 