The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FBPSUG2004 - Operate tamping equipment

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare work

  1. Identify the location and scope of work according to specifications
  2. Confirm and prepare materials required to complete the work to specifications
  3. Carry out pre-operational checks, confirm operational status of equipment, and report any faults
  4. Select and fit personal protective equipment as required
  5. Confirm that work is clearly signed according to safety procedures and that relevant authorities have been advised that work is in progress
  6. Identify and remove potential hazards from construction area before commencing work
Identify the location and scope of work according to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and prepare materials required to complete the work to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out pre-operational checks, confirm operational status of equipment, and report any faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and fit personal protective equipment as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm that work is clearly signed according to safety procedures and that relevant authorities have been advised that work is in progress

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and remove potential hazards from construction area before commencing work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate tamping equipment

  1. Operate ballast hopper to supply an even flow of ballast to the specified thickness
  2. Operate tamper equipment to lift, line track and pack ballast to specification
  3. Dress track by final ballast spread and trim to meet the specified profile
  4. Check track to confirm that design and construction specifications are met
Operate ballast hopper to supply an even flow of ballast to the specified thickness

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate tamper equipment to lift, line track and pack ballast to specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dress track by final ballast spread and trim to meet the specified profile

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check track to confirm that design and construction specifications are met

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse and respond to abnormal performance

  1. Identify causes of abnormal performance from operating data and plant operating conditions
  2. Identify and report hazards according to workplace safety requirements
  3. Take corrective action to rectify abnormal performance according to workplace procedures
  4. Implement emergency procedures according to workplace safety procedures
Identify causes of abnormal performance from operating data and plant operating conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and report hazards according to workplace safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take corrective action to rectify abnormal performance according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement emergency procedures according to workplace safety procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work

  1. Clear the construction area of debris according to workplace procedures
  2. Store unused materials according to workplace procedures
  3. Shut down and park equipment according to operating procedures
  4. Clean and store tools, plant and equipment according to workplace procedures
  5. Record workplace information according to workplace requirements
  6. Identify the location and scope of work according to specifications
  7. Confirm and prepare materials required to complete the work to specifications
  8. Carry out pre-operational checks, confirm operational status of equipment, and report any faults
  9. Select and fit personal protective equipment as required
  10. Confirm that work is clearly signed according to safety procedures and that relevant authorities have been advised that work is in progress
  11. Identify and remove potential hazards from construction area before commencing work
Clear the construction area of debris according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Store unused materials according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shut down and park equipment according to operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean and store tools, plant and equipment according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record workplace information according to workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify the location and scope of work according to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and prepare materials required to complete the work to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out pre-operational checks, confirm operational status of equipment, and report any faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and fit personal protective equipment as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm that work is clearly signed according to safety procedures and that relevant authorities have been advised that work is in progress

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and remove potential hazards from construction area before commencing work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge