Evidence Guide: FDFSUG101A - Install pre-ballast

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FDFSUG101A - Install pre-ballast

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare work

  1. The location and scope of work are identified
  2. Materials required to complete the work are confirmed and available
  3. Equipment status is confirmed
  4. Personal protective equipment is selected, correctly fitted and used
  5. Safety procedures are followed to confirm that work is clearly signed and relevant authorities are advised that work is in progress
  6. Site is inspected prior to commencing work to identify and remove potential hazards
The location and scope of work are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials required to complete the work are confirmed and available

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment status is confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Personal protective equipment is selected, correctly fitted and used

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety procedures are followed to confirm that work is clearly signed and relevant authorities are advised that work is in progress

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is inspected prior to commencing work to identify and remove potential hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out base and run pre-ballast

  1. Base/foundation is set out from off-set pegs to centre line and width for ballast according to track design and specifications
  2. Pre-ballast is applied evenly to meet specified thickness
  3. Pre-ballast is compacted to meet specifications
Base/foundation is set out from off-set pegs to centre line and width for ballast according to track design and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pre-ballast is applied evenly to meet specified thickness

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pre-ballast is compacted to meet specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work

  1. The construction area is cleared of debris
  2. Unused materials are stored as required
  3. Tools, plant and equipment is cleaned and stored as required
The construction area is cleared of debris

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unused materials are stored as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, plant and equipment is cleaned and stored as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Assessment must be carried out in a manner that recognises the cultural and literacy requirements of the assessee and is appropriate to the work performed.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of ability to:

estimate material requirements for a given project

operate pre-ballast equipment to lay and compact materials to the required location and thickness

take corrective action in response to abnormal or unacceptable performance.

Context of and specific resources for assessment

Assessment must occur in a real or simulated workplace where the assessee has access to:

Site and related project information

Relevant codes of practice and industry standards

Spreader, roller and related equipment

Materials handling equipment as required

Operating procedures and related advice on equipment operation

Base materials - typically gravel and stone

Personal protective clothing and equipment

Communication systems and equipment

Housekeeping standards and procedures

Workplace information recording systems, requirements and procedures.

Method of assessment

Other units of competency relevant to the work role should be assessed in conjunction with this unit.

Guidance information for assessment

To ensure consistency in one's performance, competency should be demonstrated on more than one occasion over a period of time in order to cover a variety of circumstances, cases and responsibilities, and where possible, over a number of assessment activities.

Required Skills and Knowledge

Required skills include:

Ability to:

interpret workplace information such as drawings and related instructions to identify the project requirements

estimate material requirements for a given project

assess operational status of pre-ballast laying equipment

operate pre-ballast equipment to lay and compact materials to the required location and thickness

identify faulty operation of equipment

identify unacceptable work outcomes

take corrective action in response to abnormal or unacceptable performance

use appropriate communication methods and equipment

report and/or record corrective action as required

maintain work area to meet housekeeping standards

Required knowledge includes:

Knowledge of:

relevant state OHS legislation, standards and codes of practice relating to work responsibilities

understanding of the steps involved in constructing/repairing track

functions and basic operating principles of pre-ballast laying equipment

the impact of the pre-ballast base on related track laying operations

the quality requirements of the foundation including the materials used, thickness and compactness of foundation

common problems related to laying pre-ballast and corrective action required

traffic control signage, communication and procedures

safe work procedures including awareness of health and safety hazards related to pre-ballast laying and associated control measures and safe manual handling procedures

purpose and limitations of protective clothing and equipment

environmental issues and controls

requirements to liaise/advise related work areas

housekeeping standards for the work area

reporting and recording systems

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Policies and procedures

Work is carried out in accordance with company policies and procedures, licensing requirements, legislative requirements, codes of practice and industrial awards and agreements.

Codes of Practice

Codes of practice include the Sugar Milling Operations Industry Code of Practice and sugar industry codes of practice related to cane railway and transport operations.

Workplace information

Workplace information can include:

Standard Operating Procedures (SOPs) and

manufacturer's specifications.

Cane railway networks

Cane railway network features and their characteristics may include:

main and branch lines

yards

sidings

loops

dump points and pads

and road transport delivery points.

Information systems

Information systems may be print or screen based.

Equipment

Equipment may include:

materials handling equipment such loaders and jacks,

spreader

roller and

compacting equipment.

Equipment status

Confirming equipment status involves

conducting relevant pre-start checks

confirming that all safety guards and equipment are ready and safe to operate.

Teamwork

Work may require the ability to work within a team environment.

Communication

Communication methods may include:

use of two-way radios.