The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan boiler operation
|
|
Applicable occupational health and safety (OHS), environmental, legislative and organisational requirements relevant to planning and coordinating boiler operations are identified and followed Completed |
Evidence:
|
Boiler startup, operation and shutdown are planned in line with site requirements Completed |
Evidence:
|
Operation orders and schedules are set and communicated to personnel Completed |
Evidence:
|
Generation levels are calculated and communicated to operators Completed |
Evidence:
|
Communication with others is established and maintained in line with OHS requirements Completed |
Evidence:
|
Coordinate boiler startup and operation
|
|
Pre-operational safety and pre-startup checks and procedures are checked with the operators Completed |
Evidence:
|
Boiler startup is monitored for correct running conditions and is signed on Completed |
Evidence:
|
Continued operation of boiler and its condition are routinely checked with operating personnel Completed |
Evidence:
|
Problematic boiler operations are diagnosed, with adjustments calculated and communicated to operators Completed |
Evidence:
|
Boiler house chemicals are checked for correct labelling in line with statutory and environmental requirements Completed |
Evidence:
|
Emergency shutdown procedures are followed in case of a fire Completed |
Evidence:
|
Fuel efficiency recordings, calculations, operating log, boiler operation and equipment faults are recorded and reported Completed |
Evidence:
|
Assistance is provided to personnel with the evaluation of boiler data and performance details Completed |
Evidence:
|
Boiler management and output are monitored to record possible process improvements Completed |
Evidence:
|
Coordinate boiler shutdown and storage
|
|
Shutdown and lock-out procedures are directed in line with OHS legislation and statutory and environmental regulations Completed |
Evidence:
|
Condition of boiler is assessed and personnel are directed to undertake cleaning and maintenance requirements in line with site procedures, manufacturer recommendations and environmental requirements Completed |
Evidence:
|
Boiler is inspected, with valves and fittings removed, in line with statutory and environmental requirements Completed |
Evidence:
|
Mode of storage is selected and personnel are directed to store boiler in line with statutory requirements Completed |
Evidence:
|
Modifications are made to generation levels or schedules to ensure optimum performance, which are then communicated to personnel Completed |
Evidence:
|