NTISthis.com

Evidence Guide: FWPCOT3334 - Conduct steam boiler operations

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FWPCOT3334 - Conduct steam boiler operations

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for steam boiler operations

  1. Determine job requirements from work order and, where required, check with appropriate personnel
  2. Confirm workplace health and safety and environmental protection practices and/or procedures and emergency procedures for tasks
  3. Identify and assess hazards and take actions to mitigate risks related to steam boiler operations
  4. Select and use appropriate personal protective equipment and check for operational effectiveness
  5. Identify and set quantity of steam to be generated for allocated process as specified in work order
  6. Check boiler house chemicals for correct labelling to ensure compliance with safety and regulatory requirements
  7. Complete pre-operational safety and pre-start-up checks to ensure operational effectiveness of boiler
Determine job requirements from work order and, where required, check with appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm workplace health and safety and environmental protection practices and/or procedures and emergency procedures for tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and assess hazards and take actions to mitigate risks related to steam boiler operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and use appropriate personal protective equipment and check for operational effectiveness

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and set quantity of steam to be generated for allocated process as specified in work order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check boiler house chemicals for correct labelling to ensure compliance with safety and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete pre-operational safety and pre-start-up checks to ensure operational effectiveness of boiler

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Start up and monitor boiler

  1. Start boiler according to workplace procedures
  2. Assess boiler condition for anomalies during start-up, and rectify or report to relevant personnel according to workplace procedures
  3. Monitor boiler operation, diagnose status and adjust to maintain safe and efficient operation
  4. Store and record boiler house chemicals according to workplace safety and environmental protection practices and/or procedures
  5. Shut down boiler in cases of fire according to emergency procedure
  6. Record and report boiler operation and fuel efficiency to appropriate personnel
Start boiler according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess boiler condition for anomalies during start-up, and rectify or report to relevant personnel according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor boiler operation, diagnose status and adjust to maintain safe and efficient operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Store and record boiler house chemicals according to workplace safety and environmental protection practices and/or procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shut down boiler in cases of fire according to emergency procedure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record and report boiler operation and fuel efficiency to appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shut down, inspect and store boiler

  1. Isolate and shut down boiler according to workplace safety procedures
  2. Prepare boiler for periodic internal and external inspection according to workplace procedures and manufacturer instructions
  3. Inspect and test boiler regularly according to workplace boiler inspection and maintenance program
  4. Remove valves and fittings according to workplace procedures and manufacturer requirements, if required
  5. Clean boiler externally and internally, as required, according to workplace procedures, environmental protection requirements and manufacturer instructions
  6. Select storage mode and store boiler according to workplace procedures
  7. Record and report equipment faults and maintenance requirements to appropriate personnel
Isolate and shut down boiler according to workplace safety procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare boiler for periodic internal and external inspection according to workplace procedures and manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and test boiler regularly according to workplace boiler inspection and maintenance program

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove valves and fittings according to workplace procedures and manufacturer requirements, if required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean boiler externally and internally, as required, according to workplace procedures, environmental protection requirements and manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select storage mode and store boiler according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record and report equipment faults and maintenance requirements to appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge