NTISthis.com

Evidence Guide: FWPCOT3342 - Screen wood chips

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FWPCOT3342 - Screen wood chips

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for wood chip screening

  1. Determine job requirements from work order or instructions and, where required, check with appropriate personnel
  2. Confirm workplace health and safety and environmental protection practices and/or procedures for task, including use of personal protective equipment
  3. Identify and assess hazards and take actions to mitigate risks related to operation of wood chip screening system
  4. Confirm type and quantity of wood chips to be screened from production process
  5. Complete pre-operational checks on wood chip screening system according to manufacturer instructions and workplace procedures
  6. Start wood chip screening system according to workplace procedure
  7. Set and adjust operating parameters to achieve production requirements
Determine job requirements from work order or instructions and, where required, check with appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm workplace health and safety and environmental protection practices and/or procedures for task, including use of personal protective equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and assess hazards and take actions to mitigate risks related to operation of wood chip screening system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm type and quantity of wood chips to be screened from production process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete pre-operational checks on wood chip screening system according to manufacturer instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Start wood chip screening system according to workplace procedure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set and adjust operating parameters to achieve production requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and control performance of wood chip screening system

  1. Monitor product quality, plant performance and process according to workplace procedures
  2. Monitor screening continually for matter that may cause contamination
  3. Monitor conveyor operations and clear jams to ensure free flow of output material to transfer systems
  4. Maintain incoming chip supply to match downstream production requirements
  5. Identify operating and equipment faults and malfunctions, and take corrective action as required
  6. Check output chips for conformity with quality specifications and production requirements
Monitor product quality, plant performance and process according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor screening continually for matter that may cause contamination

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor conveyor operations and clear jams to ensure free flow of output material to transfer systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain incoming chip supply to match downstream production requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify operating and equipment faults and malfunctions, and take corrective action as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check output chips for conformity with quality specifications and production requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform operator maintenance on wood chip screening system

  1. Shut down and isolate wood chip screening system according to workplace health and safety procedures
  2. Clean wood chip screening system according to manufacturer instructions
  3. Conduct visual inspection of wood chip screening system according to workplace procedures
  4. Check condition of wood chip screening system components
  5. Dispose of waste according to workplace environmental protection practices and/or procedures
  6. Record and report system faults and maintenance requirements to appropriate personnel
Shut down and isolate wood chip screening system according to workplace health and safety procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean wood chip screening system according to manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct visual inspection of wood chip screening system according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check condition of wood chip screening system components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dispose of waste according to workplace environmental protection practices and/or procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record and report system faults and maintenance requirements to appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge