Evidence Guide: FWPTMM3209 - Install prefabricated timber building systems on-site

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FWPTMM3209 - Install prefabricated timber building systems on-site

What evidence can you provide to prove your understanding of each of the following citeria?

Apply workplace health and safety during on-site installation

  1. Obtain all workplace health and safety information to ensure that activities are performed safely
  2. Identify workplace and task-specific hazards and report accidents, incidents or near misses during on-site installation according to workplace health and safety requirements to maintain a safe workplace
  3. Identify and use required risk-control and safety measures and equipment according to workplace health and safety requirements
Obtain all workplace health and safety information to ensure that activities are performed safely

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify workplace and task-specific hazards and report accidents, incidents or near misses during on-site installation according to workplace health and safety requirements to maintain a safe workplace

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and use required risk-control and safety measures and equipment according to workplace health and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for installation work

  1. Obtain and review relevant workplace information, including task instructions, drawings, design specifications, schedules and manufacturer information, and seek clarification if necessary
  2. Confirm installation timeframe and sequence with relevant stakeholders or personnel to meet design specifications and on-site work schedules
  3. Review drawings and design specifications to identify the type, location and quantity requirements for fixings, connections and bracing
  4. Check building structure, slab or floor area and report non-conformance as per workplace processes
  5. Select tools, auxiliary materials and equipment for the installation of prefabricated timber building systems as required, and set up equipment to meet safe work requirements
  6. Obtain information needed to ensure that the inspection, use, maintenance and storage of equipment comply with manufacturer directions
  7. Maintain appropriate ongoing communications and briefings with key stakeholders, including feedback and timeline reviews, for the duration of the installation
Obtain and review relevant workplace information, including task instructions, drawings, design specifications, schedules and manufacturer information, and seek clarification if necessary

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm installation timeframe and sequence with relevant stakeholders or personnel to meet design specifications and on-site work schedules

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review drawings and design specifications to identify the type, location and quantity requirements for fixings, connections and bracing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check building structure, slab or floor area and report non-conformance as per workplace processes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select tools, auxiliary materials and equipment for the installation of prefabricated timber building systems as required, and set up equipment to meet safe work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain information needed to ensure that the inspection, use, maintenance and storage of equipment comply with manufacturer directions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain appropriate ongoing communications and briefings with key stakeholders, including feedback and timeline reviews, for the duration of the installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check prefabricated timber building systems logistics and storage on-site

  1. Ensure prefabricated timber building systems are delivered on-site in-line with the phase of the construction project and installation
  2. Ensure there is no risk of damage by weather (moisture), traffic or general construction to prefabricated timber building systems and that they are stored as close as practically possible to the construction site when storage is required
  3. Check prefabricated timber building systems, connections and support points for quantity, quality, tolerance compliance and conformance and damage upon delivery, and report issues to the appropriate personnel or according to operational requirements
Ensure prefabricated timber building systems are delivered on-site in-line with the phase of the construction project and installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure there is no risk of damage by weather (moisture), traffic or general construction to prefabricated timber building systems and that they are stored as close as practically possible to the construction site when storage is required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check prefabricated timber building systems, connections and support points for quantity, quality, tolerance compliance and conformance and damage upon delivery, and report issues to the appropriate personnel or according to operational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install prefabricated timber building systems

  1. Use tools and equipment safely and correctly according to operational requirements and manufacturer specifications to measure, mark out, level, finish and secure prefabricated timber building systems according to specifications
  2. Assist crane or dogger operators to lift prefabricated timber building systems in the sequential order and apply accurate placement and connection techniques to the required tolerances and specifications
  3. Check corners and walls to ensure they are accurately levelled, plumbed and squared according to specifications and operational requirements
  4. Check prefabricated timber building systems after installation against critical performance metrics and apply sealants as required to ensure compliance with fire, waterproofing and acoustic requirements and with design specifications
  5. Protect prefabricated timber building systems from damage and adverse weather conditions during the installation work and other worksite activities
Use tools and equipment safely and correctly according to operational requirements and manufacturer specifications to measure, mark out, level, finish and secure prefabricated timber building systems according to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assist crane or dogger operators to lift prefabricated timber building systems in the sequential order and apply accurate placement and connection techniques to the required tolerances and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check corners and walls to ensure they are accurately levelled, plumbed and squared according to specifications and operational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check prefabricated timber building systems after installation against critical performance metrics and apply sealants as required to ensure compliance with fire, waterproofing and acoustic requirements and with design specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Protect prefabricated timber building systems from damage and adverse weather conditions during the installation work and other worksite activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete installation

  1. Complete installation within the required timeframe and according to on-site work schedules
  2. Maintain and store hand and power tools, equipment and machinery according to operational requirements
  3. Keep work area and access areas free of debris and waste material according to operational requirements
  4. Record any quality checks and changes or variations applied to a prefabricated timber system during the on-site installation work, according to operational requirements and communicate the process
Complete installation within the required timeframe and according to on-site work schedules

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain and store hand and power tools, equipment and machinery according to operational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Keep work area and access areas free of debris and waste material according to operational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record any quality checks and changes or variations applied to a prefabricated timber system during the on-site installation work, according to operational requirements and communicate the process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge