NTISthis.com

Evidence Guide: FWPTMM5210 - Verify compliance and conformance of prefabricated timber building systems during manufacture

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FWPTMM5210 - Verify compliance and conformance of prefabricated timber building systems during manufacture

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to verify prefabricated timber building systems and components

  1. Obtain and confirm production schedule, design documentation, plans, requirements, workplace health and safety requirements and established procedures relevant to the off-site manufacturing order
  2. Identify certification and compliance requirements for prefabricated timber building system, components, materials and in-built services from design specifications or appropriate codes and standards
  3. Identify tolerances for material quality, physical dimensions and service connections from design specifications
  4. Prioritise and sequence verification work according to production schedules for completion within established timeframes
  5. Consult appropriate personnel, testers and certifiers to coordinate verification work efficiently
Obtain and confirm production schedule, design documentation, plans, requirements, workplace health and safety requirements and established procedures relevant to the off-site manufacturing order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify certification and compliance requirements for prefabricated timber building system, components, materials and in-built services from design specifications or appropriate codes and standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify tolerances for material quality, physical dimensions and service connections from design specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prioritise and sequence verification work according to production schedules for completion within established timeframes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Consult appropriate personnel, testers and certifiers to coordinate verification work efficiently

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct verification for compliance and conformance

  1. Verify that connections, structural components and physical dimensions of timber framing structure are appropriate for grade, thickness, tolerances and choice of materials according to minimum specified design requirements before installation services
  2. Verify that provisions have been made for components including hydraulics, electrical and heating, ventilation, air conditioningmechanical services and plumbing
  3. Ensure that partition/walls or floor elements are assembled according to design specifications, local codes and standards for minimising or eliminating continuity issues in the final, installed prefabricated timber building system
  4. Verify regulated components including fire-rated walls or fire protection systems for conformance with performance requirements of relevant codes, standards and design specifications, and ensure that damage is minimised within the manufacturing environment
  5. Ensure that any variations of material properties or system component decided during the off-site manufacture meet performance, design specification, relevant codes and standards
  6. Ensure that off-site installation of services conform to the appropriate local standards and are approved before delivery to the construction site
  7. Verify completed prefabricated timber building system to ensure that delivered product is safe for manual handling and meets design specifications and regulatory requirements
Verify that connections, structural components and physical dimensions of timber framing structure are appropriate for grade, thickness, tolerances and choice of materials according to minimum specified design requirements before installation services

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify that provisions have been made for components including hydraulics, electrical and heating, ventilation, air conditioningmechanical services and plumbing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that partition/walls or floor elements are assembled according to design specifications, local codes and standards for minimising or eliminating continuity issues in the final, installed prefabricated timber building system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify regulated components including fire-rated walls or fire protection systems for conformance with performance requirements of relevant codes, standards and design specifications, and ensure that damage is minimised within the manufacturing environment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that any variations of material properties or system component decided during the off-site manufacture meet performance, design specification, relevant codes and standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that off-site installation of services conform to the appropriate local standards and are approved before delivery to the construction site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify completed prefabricated timber building system to ensure that delivered product is safe for manual handling and meets design specifications and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report verification findings

  1. Identify and report non-compliance and non-conformance issues according to established procedures
  2. Make recommendations for rectifying compliance and conformance issues according to established procedures
  3. Document completion of verification work according to established procedures
Identify and report non-compliance and non-conformance issues according to established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make recommendations for rectifying compliance and conformance issues according to established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document completion of verification work according to established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge