The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for repair
|
|
Review work order and where required check with appropriate personnel. Completed |
Evidence:
|
Select appropriate personal protective equipment and check for operational effectiveness. Completed |
Evidence:
|
Obtain type and quantity of material to be repaired from the veneer production process. Completed |
Evidence:
|
Select patch strips in line with work order. Completed |
Evidence:
|
Patch veneer
|
|
Use equipment in line with organisational safety procedures, manufacturer’s instructions and environmental protection practices. Completed |
Evidence:
|
Complete pre start-up equipment checks to ensure operational effectiveness. Completed |
Evidence:
|
Set equipment controls and coordinate veneer flow with other operators to ensure minimal downtime. Completed |
Evidence:
|
Inspect veneer defects, cut patch strips minimising wastage and feed into machine. Completed |
Evidence:
|
Position veneer sheets to accept patch, and process. Completed |
Evidence:
|
Position out-feed bins or trays to collect repaired veneer and clear regularly. Completed |
Evidence:
|
Patch manually where mechanical process is not possible. Completed |
Evidence:
|
Redistribute material
|
|
Grade patched veneer in line with organisational procedures and industry standards. Completed |
Evidence:
|
Direct material to storage or processing operations in line with organisational procedures. Completed |
Evidence:
|
Dispose of irreparable material and excess patch strips in line with environmental protection practices. Completed |
Evidence:
|
Clean work area and store unused patch strips in line with organisational safety procedures. Completed |
Evidence:
|
Record and report production outcomes and equipment faults to appropriate personnel. Completed |