The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Confirm job specifications
|
|
Job requirements are read and interpreted from job documentation or production control system Completed |
Evidence:
|
Set up is planned and carried out correctly and in minimum time Completed |
Evidence:
|
Availability of all job related components is checked Completed |
Evidence:
|
Set up delivery systems
|
|
Delivery systems are set up and adjusted according to job specifications Completed |
Evidence:
|
Substrate is added to and removed from process according to job instructions Completed |
Evidence:
|
Select and prepare coating
|
|
Coating is selected according to job specifications and end-user requirements Completed |
Evidence:
|
Quality and suitability of coating is checked and appropriate action taken Completed |
Evidence:
|
Coatings and additives are prepared according to work health and safety (WHS) requirements, and manufacturer’s/supplier’s instructions with suitable precautions to minimise waste Completed |
Evidence:
|
Correct weight/volume of coating is prepared to match requirements of the job specification and coating process Completed |
Evidence:
|
Coating viscosity is confirmed as correct for the job Completed |
Evidence:
|
Formulation of coating is appropriately recorded Completed |
Evidence:
|
Set up machine for coating
|
|
Appropriate rollers/cylinders are selected and secured to the machine and set Completed |
Evidence:
|
Application system is set up and adjusted according to job specifications Completed |
Evidence:
|
Appropriate anilox roller is chosen, and installed to manufacturer’s specifications Completed |
Evidence:
|
Set doctor blades to manufacturer’s specifications Completed |
Evidence:
|
Coating delivery system is set up with correct flow and return flow determined by air pressure or pump speeds and adjusted according to job specifications Completed |
Evidence:
|
Coating blanket is cut or a plate installed for non-image areas Completed |
Evidence:
|
Blanket or plate packing is checked as suitable to the job Completed |
Evidence:
|
Coating temperature is checked and deemed suitable for the job Completed |
Evidence:
|
Drying system is set up and adjusted according to job specifications Completed |
Evidence:
|
Conduct proof run
|
|
Material to be used for proof is organised correctly Completed |
Evidence:
|
Machine is set up and operated, and roller and pressure settings are checked, to produce a specified proof according to WHS requirements, manufacturer’s specifications and enterprise procedures Completed |
Evidence:
|
Proof is visually inspected and/or tested or laboratory testing organised according to enterprise procedures Completed |
Evidence:
|
Production does not commence without client approval or authority where appropriate Completed |
Evidence:
|
Results are interpreted and adjustments are carried out according to product and machine specifications to determine adjustment requirements Completed |
Evidence:
|