NTISthis.com

Evidence Guide: ICTCBL242 - Install functional and protective telecommunications earthing system

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTCBL242 - Install functional and protective telecommunications earthing system

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install telecommunications earthing system

  1. Access site according to customer and individual site requirements
  2. Select earth wire for purpose intended according to specifications and current Australian Standards
  3. Establish location of earthing applications, eliminating risks posed by contact with remote power feeding services
  4. Select route to minimise interference to system performance and according to safe work practices
  5. Select earthing materials to comply with relevant industry standards
Access site according to customer and individual site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select earth wire for purpose intended according to specifications and current Australian Standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish location of earthing applications, eliminating risks posed by contact with remote power feeding services

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select route to minimise interference to system performance and according to safe work practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select earthing materials to comply with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and secure earth cable

  1. Maintain cable separations to meet performance requirements of application environment
  2. Check earth cable insulation is undamaged to ensure integrity of earth provided
  3. Connect the main protective earth (PE) cable to the nearest electrical switch board then isolate PE cable, beyond the main distribution frame (MDF) link bar from functional earth and telecommunication reference conductors (TRC) at all times to ensure operation according to industry standards
  4. Install and secure cable according to work health and safety (WHS) and environmental requirements, manufacturer specifications and industry standards
Maintain cable separations to meet performance requirements of application environment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check earth cable insulation is undamaged to ensure integrity of earth provided

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connect the main protective earth (PE) cable to the nearest electrical switch board then isolate PE cable, beyond the main distribution frame (MDF) link bar from functional earth and telecommunication reference conductors (TRC) at all times to ensure operation according to industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and secure cable according to work health and safety (WHS) and environmental requirements, manufacturer specifications and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Terminate and test earth cable installation

  1. Terminate earth with connectors recommended by manufacturer and according to industry standards
  2. Maintain earth continuity at all times to ensure safe and reliable system operation
  3. Maintain correct interface requirements with electrical systems according to industry standards
  4. Test earthing system according to ACMA wiring rules in safe manner
  5. Rectify earth system faults, as required, prior to re-testing
Terminate earth with connectors recommended by manufacturer and according to industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain earth continuity at all times to ensure safe and reliable system operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain correct interface requirements with electrical systems according to industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test earthing system according to ACMA wiring rules in safe manner

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rectify earth system faults, as required, prior to re-testing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete task and documentation

  1. Label earthing systems according to industry regulations
  2. Complete documentation, including test records
  3. Clean up and restore worksite
  4. Notify customer and obtain sign-off
Label earthing systems according to industry regulations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation, including test records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up and restore worksite

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify customer and obtain sign-off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge