The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan open cabling work
|
|
Identify building infrastructure that places critical constraints on cabling Completed |
Evidence:
|
Apply organisational strategies to manage other infrastructure in relation to cabling Completed |
Evidence:
|
Notify appropriate personnel of identified safety hazards at cabling worksite Completed |
Evidence:
|
Monitor work activity
|
|
Supervise unregistered cablers undertaking work in line with scope of own role and organisational procedures Completed |
Evidence:
|
Ensure installation and maintenance activity comply with legislative requirements and industry standards for safety and network integrity Completed |
Evidence:
|
Manage remote power feed
|
|
Identify and avoid risks posed by contact with remote power feeding services when performing cabling activity Completed |
Evidence:
|
Make site safe by identifying remote power feeding services that operate at above telecommunications network voltage (TNV) inside customer premises Completed |
Evidence:
|
Install and modify cable support, earthing and termination infrastructure
|
|
Install fixings and cable support structures of adequate strength, safely and aligned with the environment according to manufacturer and customer specifications Completed |
Evidence:
|
Secure catenary supports to building structure and tension, as required, to ensure cable weight can be carried in operating conditions with interference and safety segregation maintained according to current Australian Standards Completed |
Evidence:
|
Install protective earthing of metal work to industry standards, as required Completed |
Evidence:
|
Inspect installed support structure to ensure cable will not be exposed to damage during installation and general operation Completed |
Evidence:
|
Position terminating equipment and fixing according to industry codes of practice, standards and customer requirements Completed |
Evidence:
|
Inspect back-mount and outlet layout for compliance to manufacturer specifications, and allow adequate work space for ease of access and avoid overlaying Completed |
Evidence:
|
Segregate incoming and outgoing cables for ease of access and avoid overlaying Completed |
Evidence:
|
Install cables and earth wires
|
|
Install cables according to manufacturer specifications, including tension and bending stress requirements Completed |
Evidence:
|
Identify and avoid sources of possible damage to cable, including hot pipes, sharp edges, cable burn, kinks, crushing or stretching Completed |
Evidence:
|
Allow sufficient excess at cable ends to facilitate termination Completed |
Evidence:
|
Label telecommunication outlet ends of cable uniquely to match identifier at originating location Completed |
Evidence:
|
Place and secure cable to maintain safety and interference segregation according to legislative and industry standards Completed |
Evidence:
|
Install cable fasteners with correct tension, and trim or fit them flush to prevent cable sheath damage, transmission impairment or risk of personal damage Completed |
Evidence:
|
Use appropriate aerial cable installation techniques associated with supported catenaries in external environment to meet minimum above ground clearances and segregation from hazardous electrical services, according to current Australian Standards Completed |
Evidence:
|
Use appropriate underground cable installation techniques associated with minimum depth of cover and segregation from hazardous electrical and other services, according to current Australian Standards Completed |
Evidence:
|
Identify issues surrounding underground cables (excluding blown fibre tube systems) to incorporate a blocking agent within the cable to prevent the ingress of water Completed |
Evidence:
|
Install over-voltage protection devices to all cable pairs according to current Australian Standards, as required, to suppress voltage surges with the over-voltage devices connected to protective earth Completed |
Evidence:
|
Conduct a visual inspection to verify telecommunications reference conductor (TRC) / communications earthing system (CES)/earth wire insulation is protected against damage and is segregated according to relevant industry, legislative and Australian Standards Completed |
Evidence:
|
Terminate and test cables and earth wires
|
|
Remove cable sheath to allow for correct termination length without damage to underlying conductors and their insulation Completed |
Evidence:
|
Install terminating modules to different telecommunications cables according to manufacturer specifications, and cable pairs neatly and sequentially fan for termination Completed |
Evidence:
|
Terminate conductors according to recommended colour code sequence using appropriate termination tools according to manufacturer specifications Completed |
Evidence:
|
Earth cable shield, as required, according to manufacturer specifications, relevant industry codes of practice and current Australian Standards Completed |
Evidence:
|
Conduct visual inspection to confirm termination colour code sequence has been followed prior to end-to-end testing of wire and pair termination integrity Completed |
Evidence:
|
Terminate earth wires with connectors recommended by manufacturer according to industry codes of practice and current Australian Standards Completed |
Evidence:
|
Ensure earth wire continuity throughout and observe interface requirements with electrical systems Completed |
Evidence:
|
Test earthing installation for continuity and conductive resistance according to industry standards Completed |
Evidence:
|
Confirm compatibility of alterations with existing systems and test new work both in isolation and when integrated with existing systems Completed |
Evidence:
|
Conduct testing of installed cable continuity after termination Completed |
Evidence:
|
Inspect cable route to ensure correct separations
|
|
Inspect separations along the entirety of the cable route and rectify separations that do not comply with regulations Completed |
Evidence:
|
Install barriers to achieve separations where sufficient spatial separation cannot be met Completed |
Evidence:
|
Evaluate earthing needs for cable systems on customer premises
|
|
Locate existing earthing systems in customer premises and analyse earthing needs of cable products Completed |
Evidence:
|
Calculate upper and lower limits of resistance for a variety of cable system earths using relevant cable characteristics Completed |
Evidence:
|
Label earthing systems
|
|
Identify label requirements for telecommunications earthing systems Completed |
Evidence:
|
Attach label to earthing systems according to industry regulations Completed |
Evidence:
|
Create or update cable plans and records
|
|
Document installation details on record sheets and plans, and store according to customer requirements Completed |
Evidence:
|
Label cable pairs clearly as required to provide an accurate identification according to manufacturer specifications, industry standards and customer requirements Completed |
Evidence:
|
Record cabling details in cable pair record books to provide an accurate record, according to industry codes of practice and current Australian Standards Completed |
Evidence:
|
Complete telecommunications cabling advice (TCA) forms Completed |
Evidence:
|
Supervise unregistered cablers undertaking work in line with scope of own role and organisational procedures Completed |
Evidence:
|
Ensure installation and maintenance activity comply with legislative requirements and industry standards for safety and network integrity Completed |
Evidence:
|