NTISthis.com

Evidence Guide: ICTCBL252 - Joint and terminate coaxial cable

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTCBL252 - Joint and terminate coaxial cable

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install and joint coaxial cable

  1. Confirm approval for site access with customer prior to site entry
  2. Read and interpret customer installation specifications and physical conditions at site to determine layout of job
  3. Locate and identify adjoining other services according to enterprise guidelines and work health and safety (WHS) practices
  4. Test for and respond to presence of dangerous gases in underground enclosures according to enterprise guidelines
  5. Undertake approved alterations to design according to enterprise guidelines
Confirm approval for site access with customer prior to site entry

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Read and interpret customer installation specifications and physical conditions at site to determine layout of job

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate and identify adjoining other services according to enterprise guidelines and work health and safety (WHS) practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test for and respond to presence of dangerous gases in underground enclosures according to enterprise guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake approved alterations to design according to enterprise guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify placement and secure coaxial cable

  1. Use safety equipment to protect self and public
  2. Maintain coaxial cable segregation to industry standard requirements
  3. Protect integrity of coaxial shield cable to ensure no loss of performance
  4. Place cable in position with sufficient slack to allow termination and maintain minimum bend radius according to manufacturer specifications
  5. Follow installation designs to install cable safely without damage to cable or customer premises
  6. Maintain radio frequency (RF) signal strength by installing cable lengths within manufacturer or design specifications
  7. Locate securing hardware to reduce cumulative effect on cable wave shape properties and attach cable ties to minimise cable damage
Use safety equipment to protect self and public

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain coaxial cable segregation to industry standard requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Protect integrity of coaxial shield cable to ensure no loss of performance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place cable in position with sufficient slack to allow termination and maintain minimum bend radius according to manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Follow installation designs to install cable safely without damage to cable or customer premises

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain radio frequency (RF) signal strength by installing cable lengths within manufacturer or design specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate securing hardware to reduce cumulative effect on cable wave shape properties and attach cable ties to minimise cable damage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Joint coaxial cable

  1. Strip coaxial cable, according to specifications, to required length using appropriate tools
  2. Select appropriate kit to match type of coaxial cable in use and jointing method according to manufacturer recommendations
  3. Joint cable and ensure jointing fitting retains segregation of conductor and shield
  4. Seal all joints according to manufacturer specifications
Strip coaxial cable, according to specifications, to required length using appropriate tools

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select appropriate kit to match type of coaxial cable in use and jointing method according to manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Joint cable and ensure jointing fitting retains segregation of conductor and shield

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Seal all joints according to manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Terminate coaxial cable

  1. Prepare coaxial cable for termination according to specifications using appropriate tool
  2. Select connectors to match type of coaxial cable in use and use terminating method recommended by manufacturer
  3. Verify connector fitting retains segregation of conductor and shield
  4. Terminate connectors to torque as recommended by manufacturer to prevent RF leakage
  5. Test connectors to mating specifications using gauge tester
  6. Maintain continuous ground on terminations and waterproof seal to preserve cable integrity
Prepare coaxial cable for termination according to specifications using appropriate tool

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select connectors to match type of coaxial cable in use and use terminating method recommended by manufacturer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify connector fitting retains segregation of conductor and shield

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Terminate connectors to torque as recommended by manufacturer to prevent RF leakage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test connectors to mating specifications using gauge tester

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain continuous ground on terminations and waterproof seal to preserve cable integrity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete installation operation

  1. Place cables in enclosure and lay up according to manufacturer instructions and enterprise guidelines, and check that no safety hazards are evident
  2. Place other services including cables according to enterprise guidelines
  3. Reinstate site, remove waste and debris for disposal, and maintain safe worksite conditions
Place cables in enclosure and lay up according to manufacturer instructions and enterprise guidelines, and check that no safety hazards are evident

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place other services including cables according to enterprise guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Reinstate site, remove waste and debris for disposal, and maintain safe worksite conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete installation administration

  1. Complete reports according to enterprise policy
  2. Note alterations to plans using appropriate symbols
Complete reports according to enterprise policy

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Note alterations to plans using appropriate symbols

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge