NTISthis.com

Evidence Guide: ICTCBL253 - Construct underground telecommunications infrastructure

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTCBL253 - Construct underground telecommunications infrastructure

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to construct underground work

  1. Obtain construction design plan from appropriate personnel to scope work and arrange for site access
  2. Notify appropriate personnel of identified safety hazards and other services that will need to be considered
  3. Obtain plant, tools and safety equipment to perform tasks safely and efficiently
  4. Determine type of underground pit/manhole required for project as specified in construction design plan
Obtain construction design plan from appropriate personnel to scope work and arrange for site access

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify appropriate personnel of identified safety hazards and other services that will need to be considered

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain plant, tools and safety equipment to perform tasks safely and efficiently

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine type of underground pit/manhole required for project as specified in construction design plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install enclosure

  1. Use tools according to enterprise guidelines and work health and safety (WHS) regulations
  2. Determine excavation meets specification of design plan
  3. Place foundation of suitable material to provide safe and stable footing prior to installing underground enclosure in excavation
  4. Place recognised barrier over construction where enclosure is to be installed over power cables according to enterprise requirements or agreements with other authorities
  5. Install earth mat facility under enclosure as required by enterprise
  6. Install enclosure specified in construction design plan according to manufacturer specifications using specified materials
Use tools according to enterprise guidelines and work health and safety (WHS) regulations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine excavation meets specification of design plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place foundation of suitable material to provide safe and stable footing prior to installing underground enclosure in excavation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place recognised barrier over construction where enclosure is to be installed over power cables according to enterprise requirements or agreements with other authorities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install earth mat facility under enclosure as required by enterprise

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install enclosure specified in construction design plan according to manufacturer specifications using specified materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install connecting pipe works

  1. Install conduit in trench to enterprise specifications
  2. Connect conduit to enclosure according to manufacturer specifications and industry practice
Install conduit in trench to enterprise specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connect conduit to enclosure according to manufacturer specifications and industry practice

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete project

  1. Complete reports and record alterations to plans using appropriate symbols, according to enterprise policy
  2. Complete all labelling requirements according to industry standard
  3. Recover obsolete materials and equipment, and return to appropriate point for disposal
  4. Restore site according to enterprise or approving authority requirements and to customer satisfaction
  5. Notify appropriate personnel of job completion and obtain sign-off
Complete reports and record alterations to plans using appropriate symbols, according to enterprise policy

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete all labelling requirements according to industry standard

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recover obsolete materials and equipment, and return to appropriate point for disposal

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore site according to enterprise or approving authority requirements and to customer satisfaction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify appropriate personnel of job completion and obtain sign-off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge