The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install and terminate coaxial cable
|
|
Prepare for given work according to requirements of relevant legislation, codes, regulations and standards Completed |
Evidence:
|
Arrange access to the site according to required procedure Completed |
Evidence:
|
Inform appropriate personnel of identified hazards on work site Completed |
Evidence:
|
Select coaxial cable type, connectors and manufacturer’s tool to comply with installation environment and customer requirements Completed |
Evidence:
|
Check proposed route and bend radius to meet manufacturer specifications and industry standards Completed |
Evidence:
|
Test cable on drum for continuity and inspect visually for crushing and kinks Completed |
Evidence:
|
Discuss proposed method of installation and cable route with customer and adjust if necessary Completed |
Evidence:
|
Install, terminate and test coaxial cable
|
|
Maintain cable segregation to industry standards Completed |
Evidence:
|
Protect integrity of coaxial shield cable to ensure no loss of signal during operation and maintain bend ratios to not exceed manufacturer specifications and industry standard Completed |
Evidence:
|
Install cable securing hardware to ensure cable is not crushed or kinked while maintaining cable manufacturer’s bend radius Completed |
Evidence:
|
Install cable following occupational health and safety (OHS) and environmental requirements and complying with manufacturer specifications and industry standards Completed |
Evidence:
|
Terminate the cable and perform the type of termination specified in the plan using safe work practices and according to manufacturer specifications Completed |
Evidence:
|
Test termination for transmission loss and strength and re-terminate the coaxial cable if transmission loss exceeds manufacturer specifications Completed |
Evidence:
|
Record all measurements Completed |
Evidence:
|
Fit over-voltage protection devices to all cables with metallic component where required Completed |
Evidence:
|
Remove termination waste from work area
|
|
Clean work area thoroughly to minimise risk of injury from loose metal strands Completed |
Evidence:
|
Dispose of waste safely and according to relevant environmental requirements Completed |
Evidence:
|
Restore work site to original condition Completed |
Evidence:
|
Document installation
|
|
Update plans and records with details of installation and test results Completed |
Evidence:
|
Show customer completed work and ensure work matches agreed method of installation and cable route Completed |
Evidence:
|
Notify client of work completion and obtain sign-off Completed |
Evidence:
|