NTISthis.com

Evidence Guide: ICTCBL330 - Splice and terminate optical fibre cable for telecommunications projects

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTCBL330 - Splice and terminate optical fibre cable for telecommunications projects

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for splicing

  1. Select safety equipment to protect self and public according to industry guidelines and work health and safety (WHS) practices
  2. Confirm layout of installation according to physical conditions at site and relevant legislation, regulations, codes and standards
  3. Inform appropriate personnel of identified worksite hazards
  4. Locate other services from relevant authorities according to industry guidelines and safe practices
  5. Test for dangerous gases and place guards around open manholes according to WHS and environmental requirements
  6. Obtain approval for alterations to design according to industry guidelines
Select safety equipment to protect self and public according to industry guidelines and work health and safety (WHS) practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm layout of installation according to physical conditions at site and relevant legislation, regulations, codes and standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inform appropriate personnel of identified worksite hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate other services from relevant authorities according to industry guidelines and safe practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test for dangerous gases and place guards around open manholes according to WHS and environmental requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain approval for alterations to design according to industry guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check existing optical fibre cable

  1. Verify that cable is installed according to installation plan
  2. Visually inspect cable for signs of sheath damage and seek instructions from service provider when damage is identified
  3. Maintain minimum bend ratios according to manufacturer specifications to prevent cable damage and signal degradation
  4. Secure cable according to safe industry practice to avoid cable and sheath damage
Verify that cable is installed according to installation plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Visually inspect cable for signs of sheath damage and seek instructions from service provider when damage is identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain minimum bend ratios according to manufacturer specifications to prevent cable damage and signal degradation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Secure cable according to safe industry practice to avoid cable and sheath damage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Splice optical fibre cable

  1. Maintain safe work practices when using equipment to identify and verify fibre is not live before commencing splicing
  2. Seek instructions from service provider where fibre is live and, on receipt of required enterprise certification, follow service provider instructions accordingly
  3. Prepare cable end to expose optical fibres according to splicing method and manufacturer specifications
  4. Prepare and splice fibres using safe industry practice according to industry specifications
  5. Install and clean optical connectors with recommended cleaning material and re-inspect
  6. Test completed links for proof of performance according to industry standards
Maintain safe work practices when using equipment to identify and verify fibre is not live before commencing splicing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Seek instructions from service provider where fibre is live and, on receipt of required enterprise certification, follow service provider instructions accordingly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare cable end to expose optical fibres according to splicing method and manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare and splice fibres using safe industry practice according to industry specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and clean optical connectors with recommended cleaning material and re-inspect

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test completed links for proof of performance according to industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Terminate optical fibre cable

  1. Select connector unit to suit terminating frame according to design specifications
  2. Terminate cable according to design method and manufacturer specifications
  3. Test termination for transmission loss and light levels, and re-terminate if transmission loss exceeds industry standard
  4. Install protection devices on connectors to protect from exposure and contaminants
  5. Label and lay up cables in enclosure according to manufacturer instructions and industry guidelines
Select connector unit to suit terminating frame according to design specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Terminate cable according to design method and manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test termination for transmission loss and light levels, and re-terminate if transmission loss exceeds industry standard

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install protection devices on connectors to protect from exposure and contaminants

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Label and lay up cables in enclosure according to manufacturer instructions and industry guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish job and report

  1. Remove waste and reinstate site according to industry guidelines
  2. Prepare reports, including test results and alterations to plans, according to telecommunications industry or enterprise policies
  3. Notify appropriate personnel of work completion and obtain sign-off
  4. Select safety equipment to protect self and public according to industry guidelines and work health and safety (WHS) practices
  5. Confirm layout of installation according to physical conditions at site and relevant legislation, regulations, codes and standards
  6. Inform appropriate personnel of identified worksite hazards
  7. Locate other services from relevant authorities according to industry guidelines and safe practices
  8. Test for dangerous gases and place guards around open manholes according to WHS and environmental requirements
  9. Obtain approval for alterations to design according to industry guidelines
Remove waste and reinstate site according to industry guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare reports, including test results and alterations to plans, according to telecommunications industry or enterprise policies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify appropriate personnel of work completion and obtain sign-off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select safety equipment to protect self and public according to industry guidelines and work health and safety (WHS) practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm layout of installation according to physical conditions at site and relevant legislation, regulations, codes and standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inform appropriate personnel of identified worksite hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate other services from relevant authorities according to industry guidelines and safe practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test for dangerous gases and place guards around open manholes according to WHS and environmental requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain approval for alterations to design according to industry guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge