Evidence Guide: ICTCBL335 - Construct aerial cable supports

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTCBL335 - Construct aerial cable supports

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare site for installation

  1. Access site according to required enterprise procedures
  2. Verify aerial cable support installation requirementsaccording to approved designs, and recognise and plan for constraints
  3. Obtain information about location of other services from relevant authorities
  4. Inform appropriate personnel of existing and potential worksite hazards
  5. Assess support structure safety according to standard working conditions and proceed according to this assessment
  6. Set up cable support installation equipment according to manufacturer requirements and enterprise guidelines
Access site according to required enterprise procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify aerial cable support installation requirementsaccording to approved designs, and recognise and plan for constraints

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain information about location of other services from relevant authorities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inform appropriate personnel of existing and potential worksite hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess support structure safety according to standard working conditions and proceed according to this assessment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up cable support installation equipment according to manufacturer requirements and enterprise guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install aerial support structures

  1. Select type of aerial cable support for catenary wire or integrated bearer or self-supporting cable installation
  2. Use basic rigging procedures, methods and equipment for working safely at heights
  3. Erect barriers and signage according to safety requirements
  4. Construct support foundations to specifications and provide for safe and secure operation of support structure
  5. Install aerial cable supports securely and safely according to plan, manufacturer specifications, industry standards and authorisations
Select type of aerial cable support for catenary wire or integrated bearer or self-supporting cable installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use basic rigging procedures, methods and equipment for working safely at heights

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect barriers and signage according to safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct support foundations to specifications and provide for safe and secure operation of support structure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install aerial cable supports securely and safely according to plan, manufacturer specifications, industry standards and authorisations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore site and complete documentation

  1. Undertake quality check on completed installation
  2. Reinstate site to identified requirements
  3. Complete reports on installation and design amendments and record according to telecommunications industry requirements
  4. Notify customer and obtain sign-off
Undertake quality check on completed installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Reinstate site to identified requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete reports on installation and design amendments and record according to telecommunications industry requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify customer and obtain sign-off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge