Evidence Guide: ICTOPN405 - Install and test a dense wavelength division multiplexing system

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTOPN405 - Install and test a dense wavelength division multiplexing system

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install DWDM units

  1. Determine number of racks and DWDM units at each site according to installation documents
  2. Determine DWDM unit and equipment positions within individual racks
  3. Assemble equipment racks according to safe industry practice and manufacturer instructions
  4. Select tools and equipment for DWDM unit installation
  5. Prepare patch panels with connectors according to installation plan
Determine number of racks and DWDM units at each site according to installation documents

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine DWDM unit and equipment positions within individual racks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble equipment racks according to safe industry practice and manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select tools and equipment for DWDM unit installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare patch panels with connectors according to installation plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install DWDM units and associated cabling

  1. Install DWDM unit in designated rack position to maintain planned link budget margin
  2. Install patch panels and ancillary equipment and connections into equipment rack in preparation for commissioning procedures
  3. Insert circuit cards into specified slot locations in readiness for commissioning procedures without seating cards into backplane or locking into position
  4. Connect optical fibre cables between circuit cards, optical multiplexers, adjoining DWDM units and patch panels, according to manufacturer specifications
  5. Seat cards into backplane and lock into position
Install DWDM unit in designated rack position to maintain planned link budget margin

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install patch panels and ancillary equipment and connections into equipment rack in preparation for commissioning procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Insert circuit cards into specified slot locations in readiness for commissioning procedures without seating cards into backplane or locking into position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connect optical fibre cables between circuit cards, optical multiplexers, adjoining DWDM units and patch panels, according to manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Seat cards into backplane and lock into position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test power connections and complete installation report

  1. Measure main and redundant power supplies to verify correct polarity of ground and power connections
  2. Rectify any identified power wiring fault as required
  3. Confirm cooling fans, panel lights, indicator lights and alarms behave according to manufacturer prescribed specifications when power is applied
  4. Complete installation report and reinstate site
Measure main and redundant power supplies to verify correct polarity of ground and power connections

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rectify any identified power wiring fault as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm cooling fans, panel lights, indicator lights and alarms behave according to manufacturer prescribed specifications when power is applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete installation report and reinstate site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge