The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Work within the constraints imposed by commercial premises
|
|
Identify building infrastructure which places critical constraints on cabling Completed |
Evidence:
|
Develop strategies to manage other infrastructure in relation to cabling Completed |
Evidence:
|
Manage Remote Power Feed
|
|
Identify the risks posed by contact with Remote Power Feeding services Completed |
Evidence:
|
Identify Remote Power Feeding services in a range of commonly encountered circumstances inside customer premises. Completed |
Evidence:
|
Install/alter cables and protective earth wires
|
|
Cables/wires handled in accordance with manufacturer's application specifications including tension and bending stress requirements Completed |
Evidence:
|
Sources of possible damage to cable/wires are identified and avoided including hot pipes, sharp edges and cable burn Completed |
Evidence:
|
Sufficient excess is allowed at cable ends to facilitate termination Completed |
Evidence:
|
Cable is placed and secured to maintain safety and interference segregation in accordance with legislative and industry standards Completed |
Evidence:
|
Cable ties not tightened to the point of causing cable sheath damage or transmission impairment and trimmed flush to prevent risk of personal damage Completed |
Evidence:
|
Cables installed underground shall meet minimum depth of cover and segregation from hazardous electrical and other services as per AS/ACIF009 Completed |
Evidence:
|
Aerial cables installed shall meet minimum clearance, segregation from hazardous electrical and other services and minimum height requirements as per AS/ACIF009 Completed |
Evidence:
|
In accordance with AS/ACIF009, overvoltage protection devices are fitted to all cable pairs where required to suppress voltage surges and protect from EPR hazards and the devices protectively earthed Completed |
Evidence:
|
Earth wire insulation is protected against damage and protective earths segregated in accordance with relevant industry and legislative standards Completed |
Evidence:
|
Terminate and test cables and earth wires
|
|
Cable sheath removed to allow for correct termination length and without damage to underlying conductors and their insulation Completed |
Evidence:
|
NTD terminating modules are installed in accordance to manufacturer's specifications and cable pairs neatly and sequentially fanned for termination Completed |
Evidence:
|
Conductors are terminated in accordance with recommended colour code sequence using appropriate termination tools in the manufacturer's specified manner Completed |
Evidence:
|
Cable shield (if applicable) is earthed to manufacturer's specifications and relevant industry codes of practice and AS/ACIF009 Completed |
Evidence:
|
Visual inspection is undertaken to confirm termination colour code sequence has been followed prior to end to end testing of wire and pair termination integrity Completed |
Evidence:
|
Earth wires are terminated with connectors recommended by manufacturers in accordance with accepted industry codes of practice and AS/ACIF009 Completed |
Evidence:
|
Earth wire continuity is maintained through out and interface requirements with electrical systems are observed Completed |
Evidence:
|
Earthing installation shall be tested for continuity, insulation resistance and conductive resistance as per accepted industry standards including AS/ACIF009 Completed |
Evidence:
|
Compatibility of alterations with existing systems is confirmed and new wok tested both in isolation and when integrated with existing systems Completed |
Evidence:
|
Inspect cable route to ensure correct separations
|
|
Check separations along the entirety of the cable route Completed |
Evidence:
|
Rectify separations which do not comply with regulations Completed |
Evidence:
|
Install barriers to achieve separations where spatial separation can't be met Completed |
Evidence:
|
Create records
|
|
Complete TCA1 form and create NTD records Completed |
Evidence:
|
Monitor work activity
|
|
Supervision of cablers not holding appropriate registration for the task is maintained to ensure installation/maintenance activity is in accordance with legislative requirements for safety and network integrity including AS/ACIF008 and AS/ACIF009 Completed |
Evidence:
|