Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTTEN322 - Provide infrastructure for telecommunications network customer equipment

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for installation infrastructure work

  1. Notify customer to arrange site access and obtain installation plan and specifications
  2. Conduct site survey to verify infrastructure installation requirements can be met
  3. Identify site hazards and notify appropriate personnel to make site safe
  4. Notify customer of alterations required to installation design and make recommendations for possible solutions
  5. Obtain approval for alterations and update installation plan as required
  6. Develop installation activity schedule to minimise disruption to the workplace and according to relevant regulations and standards
  7. Obtain material supplies, safety equipment, resources, tools and test equipment to be available as required for installation for safe work practice
Notify customer to arrange site access and obtain installation plan and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct site survey to verify infrastructure installation requirements can be met

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify site hazards and notify appropriate personnel to make site safe

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify customer of alterations required to installation design and make recommendations for possible solutions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain approval for alterations and update installation plan as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop installation activity schedule to minimise disruption to the workplace and according to relevant regulations and standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain material supplies, safety equipment, resources, tools and test equipment to be available as required for installation for safe work practice

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Build customer equipment infrastructure

  1. Prepare for given work according to work health and safety (WHS) and environmental requirements
  2. Fit-out telecommunications closet, cabinet or equipment room to house equipment, distributors and AC/DC power systems according to design plans, manufacturer specifications, and safety and electrical standards
  3. Build cable support systems for signal, data cabling and optical cables, including entrance facilities, intra-, and inter-building facilities according to plan and specifications
  4. Organise installation of mains AC electrical power cabling infrastructure according to plan and specifications
  5. Install cable distribution frames according to plan and manufacturers specifications
  6. Install protective earthing to metal infrastructures or gas arrestors according to specifications or design
Prepare for given work according to work health and safety (WHS) and environmental requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit-out telecommunications closet, cabinet or equipment room to house equipment, distributors and AC/DC power systems according to design plans, manufacturer specifications, and safety and electrical standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Build cable support systems for signal, data cabling and optical cables, including entrance facilities, intra-, and inter-building facilities according to plan and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise installation of mains AC electrical power cabling infrastructure according to plan and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install cable distribution frames according to plan and manufacturers specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install protective earthing to metal infrastructures or gas arrestors according to specifications or design

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install uninterrupted power supply power infrastructure

  1. Install batteries, rectifiers and uninterrupted power supply (UPS) systems as required by specifications or design and connect according to manufacturer and WHS requirements
  2. Test and monitor UPS battery discharge levels and obtain replacement batteries under warranty as required
  3. Identify and rectify faults where possible or escalate according to enterprise policy
Install batteries, rectifiers and uninterrupted power supply (UPS) systems as required by specifications or design and connect according to manufacturer and WHS requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test and monitor UPS battery discharge levels and obtain replacement batteries under warranty as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and rectify faults where possible or escalate according to enterprise policy

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore site and complete documentation

  1. Attach infrastructure labels and designations according to enterprise requirements
  2. Complete inspection sheets and declare asset ready for customer sign-off documentation
  3. Clean-up site
  4. Notify customer and obtain sign-off
Attach infrastructure labels and designations according to enterprise requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete inspection sheets and declare asset ready for customer sign-off documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean-up site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify customer and obtain sign-off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge