The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Obtain access to work site safely and with authority from site owner
|
|
Obtain and review DWDM installation brief Completed |
Evidence:
|
Determine site access requirements Completed |
Evidence:
|
Notify parties if necessary to arrange access to site to discuss DWDM installation requirements Completed |
Evidence:
|
Assess site-specific safety requirements and enterprise work health and safety (WHS) processes and procedures Completed |
Evidence:
|
Prepare to install design DWDM units
|
|
Survey location for DWDM installation and scope the installation parameters Completed |
Evidence:
|
Identify suitable location for DWDM equipment racks Completed |
Evidence:
|
Determine number and location of shelves and cards in the racks Completed |
Evidence:
|
Determine capacity of the optical distribution frames (ODFs), patching and network management system (NMS) connections for the installation Completed |
Evidence:
|
Determine power feed options Completed |
Evidence:
|
Design DWDM units and associated cabling
|
|
Design DWDM racks, including locations and layout Completed |
Evidence:
|
Examine standards, practices and requirements for designing DWDM systems Completed |
Evidence:
|
Design DWDM shelf and card positions from customer and manufacturer documents Completed |
Evidence:
|
Design supporting patch panel and jumpering schemes Completed |
Evidence:
|
Include appropriate ancillary equipment and connections in design specifications Completed |
Evidence:
|
Prepare detailed design drawings for racks, shelves and cards from manufacturer and carrier documents Completed |
Evidence:
|
Prepare detailed design drawings for patching, jumpering and power feeds from manufacturer and carrier documents Completed |
Evidence:
|
Review design for compliance with standards and legislation
|
|
Confirm that DWDM installation design meets the brief Completed |
Evidence:
|
Review installation design to ensure compliance with requirements of federal, state and local regulations, relevant legislation, codes and standards Completed |
Evidence:
|