Evidence Guide: ICTTEN6045A - Implement planned network changes with minimal impact to the customer

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICTTEN6045A - Implement planned network changes with minimal impact to the customer

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for network changes plan

  1. Obtain relevant legislation, codes, regulations and standards for compliance when conducting work
  2. Evaluate work order with relevant personnel and identify the likely effects on the network and impact on customers of the planned changes
  3. Develop network engineering strategies including management of outages with involvement of the network operations centre (NOC)
  4. Prepare and produce a network changes plan for approval according to enterprise practice
Obtain relevant legislation, codes, regulations and standards for compliance when conducting work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate work order with relevant personnel and identify the likely effects on the network and impact on customers of the planned changes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop network engineering strategies including management of outages with involvement of the network operations centre (NOC)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare and produce a network changes plan for approval according to enterprise practice

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement and test network changes prior to customer utilisation

  1. Implement network changes according to network engineering strategies following occupational health and safety (OHS) and environmental requirements with minimal impact to customer traffic
  2. Conduct integration testing of newly installed equipment to ensure interoperability with existing equipment and network
  3. Conduct performance test to assess the network changes as stated in manufacturer'sspecifications and enterprise acceptance testing procedures
  4. Analyse test results and rectify problems or escalate according to enterprise procedures
  5. Initiate quality assurance procedures to ensure confidence in quality of processes according to enterprise policy
  6. Prepare reports for the appropriate area within the enterprise
Implement network changes according to network engineering strategies following occupational health and safety (OHS) and environmental requirements with minimal impact to customer traffic

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct integration testing of newly installed equipment to ensure interoperability with existing equipment and network

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct performance test to assess the network changes as stated in manufacturer'sspecifications and enterprise acceptance testing procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse test results and rectify problems or escalate according to enterprise procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Initiate quality assurance procedures to ensure confidence in quality of processes according to enterprise policy

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare reports for the appropriate area within the enterprise

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Enable functionality of network changes to customer

  1. Monitor network stability prior to connecting customer traffic and take action to rectify any problems
  2. Enable full functionality of network changes to customer according to the network changes plan and monitor network to ensure continued stability
  3. Prepare appropriate documentation according to enterprise requirements
Monitor network stability prior to connecting customer traffic and take action to rectify any problems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Enable full functionality of network changes to customer according to the network changes plan and monitor network to ensure continued stability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare appropriate documentation according to enterprise requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess and report on implementation of network changes

  1. Use monitoring data to evaluate the performance of the network changes and impact to customers according to network engineering strategies and customer requirements
  2. Document the implementation of the planned network changes and recommend any further improvements as part of the enterprise's quality assurance system
Use monitoring data to evaluate the performance of the network changes and impact to customers according to network engineering strategies and customer requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document the implementation of the planned network changes and recommend any further improvements as part of the enterprise's quality assurance system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the ability to:

evaluate planned network changes, including impact on customer

develop network engineering strategies to manage outages

implement network changes

conduct integration testing, analyse results and rectify faults

enable full functionality of network changes.

Context of and specific resources for assessment

Assessment must ensure:

sites where network changes may be conducted

use of testing equipment currently used in industry

systems manuals, specifications and enterprise policy.

Method of assessment

A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:

direct observation of the candidate implementing network changes

review of network changes plan prepared by the candidate outlining network engineering strategies to manage outages

review of test results and documentation completed by the candidate

oral or written questioning to assess required knowledge.

Guidance information for assessment

Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:

ICTTEN6044A Coordinate fault rectification and restoration of service following network outages.

Aboriginal people and other people from a non-English speaking background may have second language issues.

Access must be provided to appropriate learning and assessment support when required.

Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.

In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.

Where applicable, physical resources should include equipment modified for people with special needs.

Required Skills and Knowledge

Required skills

analytical skills to asses network changes and make recommendations

communication skills to interact with enterprise personnel, customers and other contractors keeping a customer focus and consideration of customer needs

literacy skills to read, interpret and use equipment and system manuals and specifications and relevant enterprise policy and documentation

planning and organisational skills to coordinate all work groups associated with network change

PC skills to load software and hardware

problem solving skills to account for unexpected faults or equipment incompatibilities

research skills to gain and maintain relevant and current technical product knowledge

safety awareness skills to adhere to all related OHS requirements and work practices

technical skills to:

conduct performance testing

correctly handle, connect and calibrate test equipment

interpret test results, diagnose and rectify faults

perform integration testing

Required knowledge

compatibility and interoperability of system types

factors affecting network stability

hardware

internet protocol (IP) based networks

legislation and licensing relevant to work activity

optical networks

quality assurance procedures

software

test equipment types suitable for tests to be made

types of customer networks

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant legislation, codes, regulations and standards may relate to:

Australian Communications Industry Forum (ACIF) standards and codes

AS Communications Cabling Manual (CCM) Volume 1

AS/NZS 3000:2007

AS/NZS 3080:2003

AS/NZS 3084:2003

AS/NZS 3085.1:2004

AS/NZS IEC 61935.1:2006

AS/NZS IEC 61935.2:2006

AS/NZS ISO/IEC 14763.3:2007

AS/NZS ISO/IEC 15018:2005

AS/NZS ISO/IEC 24702:2007

Australian building codes and regulations

cabling security codes and regulations

compliance with appropriate Australian Communications and Media Authority (ACMA) technical standard requirements for underground, aerial, Category 5, 6, 6A, 7 or 7A, and unshielded twisted pairs (UTP)

Environmental Protection Acts

fire regulations

noise abatement and heritage legislation

OHS

relevant international standards

technical standards AS/ACIF S008:2006 and AS/ACIF S009:2006

Trade Practices Act.

Work order may include:

authority to proceed with change to the network

list of activities to be undertaken

schedule of activities.

Relevant personnel may include:

carrier or service provider staff

electrical contractor

equipment manufacturer

equipment supplier

external customer

on site operation staff.

Likely effects may include:

congestion

drop out

excessive latency

limited coverage

loss of coverage

loss of service

poor grade of service (GoS)

poor signal quality

routing problems.

Network may include:

cellular mobile networks

data and voice

IP network

national wide area networks (WAN)

optical dense wavelength division multiplexing (DWDM) networks

public switched telephone network (PSTN).

Impact may include:

disruption of service to residential customers

intermittent performance

loss of service and revenue to an enterprise.

Customers may include:

building owner

communications consultant

contractor to a major supplier

end users

equipment owner

householder

operations staff.

Network engineering strategies may include:

provision of redundant path

rerouting of traffic

supply of temporary equipment to maintain minimal services.

Outages may include:

loss of service to customers due to a network disruption

planned outage in the case of network upgrade

unplanned outage in relation to fault.

Network Operations Centre may include:

engineering unit within a carrier responsible for:

controlling the network

coordinating repairs or changes to the network

monitoring the network

performing diagnostic tests.

Enterprise practice may include:

procedures for implementing installation

procedures for implementing maintenance

reporting tasks.

OHS and environmental requirements may relate to:

decommissioning and isolating worksite and lines prior to commencement

gas and other hazard detection equipment

identifying other services, including power and gas

safety equipment:

flashing lights

safety barriers

trench guards

warning signs and tapes

witches hats

safe working practices, such as the safe use and handling of:

asbestos

chemicals

materials

tools and equipment

work platforms

special access requirements

suitable light and ventilation

environmental considerations:

clean-up protection

noise, dust and clean-up management

stormwater protection

waste management.

Customer traffic may include:

analog or digital forms of:

data

image

voice.

Integration testing may include:

compatibility

interface units

interoperability.

Performance test may include:

bandwidth

blocking

call rate

congestion

distortion

drop out rate

functionality

interference

latency

network tests

optical transmission tests

packet loss rate

quality of service (QoS)

radio transmission test

recovery rate

redundancy

signal to noise ratio

switching tests

transmission tests

transmission tests

transmitted power measurements

upload and download rate.

Manufacturer's specifications may include:

electrical

environmental parameters

mechanical

regulatory.

Acceptance testing may include:

testing equipment following major upgrade

testing newly installed equipment.

Escalate may include:

greater involvement from the NOC specialist personnel

requesting vendor specialist technical support.

Quality assurance may include:

acting on logs, reports and other data to guide ongoing quality improvements

reporting on installation or maintenance activities

updating logs.

Network stability may include:

alarm monitoring

congestion activity report

fault incidence report

network management report

traffic flow measurements.